My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COURTHOUSE SQUARE - SALEM <br />Vendor Material Recy Wqt is W t (~t [ Rec'd/(Paid~ Date Xoort Cost <br />RIVERBEND CONC 54 ($27.00) 6/17/97 $213.75 <br />RIVERBEND CONC 162 ($81.00) 6/17/97 $641.25 <br />RIVERBEND CONC 153 ($76.50) 6/18/97 $512.50 <br />RIVERBEND CONC 54 ($27.00) 6/18/97 $307.50 <br />RIVERBEND CONC 90 ($45.00) 6/18/97 $512.50 <br />RIVERBEND CONC 18 ($9.00) 6/19/97 $142.50 <br />RIVERBEND CONC 18 ($9.00) 6/19/97 $142.50 <br />RIVERBEND CONC 18 ($9.00) 6/19/97 $142.50 <br />RIVERBEND CONC 36 ($18.00) 6/19/97 $142.50 <br />RIVERBEND CONC 54 ($27.00) 6/20/97 $213.75 <br />RIVERBEND CONC 72 ($36.00) 6/20/97 $285.00 <br />SCHNITZER STEEL 8.97 $565.11 6/10/97 $365.00 <br />SCHNITZER STEEL 7.2 $453.60 6/12/97 $396.25 <br />SCHNITZER STEEL 11.5 $724.50 6/12/97 $405.00 <br />SCHNITZER STEEL 17.14 $1,079.82 6/13/97 $405.00 <br />SCHNITZER STEEL 12.83 $808.29 6/18/97 $385.00 <br />SCHNITZER STEEL 9.43 $594.09 6/18/97 $385.00 <br />SCHNITZER STEEL 11.6 $730.80 6/19/97 $365.00 <br />SCHNITZER STEEL 9.84 $619.92 6/24/97 $365.00 <br />SCHNITZER STEEL 10.3 $566.50 6/26/97 $342.50 <br />SCHNITZER STEEL 11.75 $528.75 6/27/97 $342.50 <br />SCHNITZER STEEL 17.81 $1,246.70 6/30/97 $342.50 <br />SCHNITZER STEEL 9.89 $623.07 7/8/97 ~405.00 <br />SCHNITZER STEEL 6.54 $412.02 7/14/97 $302.50 <br />SCHNITZER STEEL 7.2 $453.60 7/14/97 $302.50 <br />SCHNITZER STEEL 10.17 $640.71 7/14/97 $342.50 <br />SCHNIZTER STEEL 6.33 $398.79 7/14/97 $342.50 <br />STATON BRICKS 100 $0.00 7/3/97 $485.00 <br />STATON BRICKS 45 $0.00 7/3/97 $210.00 <br />STATON CONC 728 $0.00 7/2/97 $0.00 <br />W WASTE ASPHALT 93.3 ($950.00) 6/10/97 $716.25 <br />W WASTE ASPHALT 65.75 ($1,000.00) 6/10/97 $756.25 <br />W WASTE ASPHALT 126.15 ($950.00) 6/10/97 $756.25 <br />W WASTE CONC 15.6 ($30.00) 6/13/97 $102.50 <br />W WASTE WOOD 25.38 ($594.00) 6/19/97 $650.00 <br />W WASTE WOOD 15.98 ($385.00) 6/19/97 $325.00 <br />W WASTE WOOD 12.69 ($297.00) 6/19/97 $325.00 <br />W WASTE WOOD 19.03 ($445.50) 6/20/97 $487.50 <br />W WASTE WOOD 15.27 ($358.00) 6/20/97 $325.00 <br />W WASTE WOOD 51.7 ($1,210.00) 6/24/97 $810.00 <br />W WASTE WOOD 16.45 ($385.00) 6/24/97 $382.50 <br />W WASTE WOOD 49.45 ($1,182.50) 6/25/97 $730.00 <br />W WASTE WOOD 55.35 ($935.00) 6/25/97 $912.50 <br />W WASTE WOOD 52.07 ($698.50) 6/25/97 $730.00 <br />W WASTE WOOD 43.05 ($577.50) 6/30/97 $667.50 <br />W WASTE WOOD 71.75 ($962.50) 7/2/97 $912.50 <br />W WASTE WOOD 21.5 ($385.00) 7/3/97 $365.00 <br />W WASTE WOOD 21.55 ($385.00) 7/3/97 $365.00 <br />W WASTE WOOD 51.66 ($693.00) 7/7/97 $730.00 <br /> SUM: SUM: SUM: SUM: SUM: <br /> 3262.74 335.02 279 ($6,014.64) $28,469.87 <br />prepared by: STATON CONSTRUCTION INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.