My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COURTHOUSE SflUARE - SALEM <br />5alem - RECY/DISP AMT <br />Vendor NL~t~ti~l ~Y 1d9~ Disn 1d9t 4tX R~s~dL(P_~~il ~~R CQ~t <br />CH C;TY TIN 4.68 $9C1.55 9/11/01 $0.00 <br />CH CITY TIN 4.28 $78.55 6/9/97 $Q.00 <br />CH CITY TIN 6.16 ~"~34.95 6/11/97 $0.00 <br />CH CiiY TIN 4.98 $99.55 6/12/97 $0.00 <br />CH CITY TIN 5.56 $116.95 6/13/97 $0.00 <br />CH CITY TIN 4.53 $86.G5 6/16/97 $0.00 <br />COFFIN B CARPET 8.26 ($231.28) 6/17/97 ~142.50 <br />COFFIN B CARPET 6.64 ($185.92) 6/17/97 ;u142.50 <br />COFFIN B GARPET 7.72 (~216.16) 6/17/97 $142.50 <br />COFFIN B DFBRIS 16.53 ($462.84} 6/16/97 $142.50 <br />COFFIN B DEBRIS 15.11 ($423.08) 6/16/97 $142.50 <br />COFFIN B DEBRIS 8.85 ($247.80) 6/18/97 $142.50 <br />COFFIN B DEBRIS 23.68 ($663.04) 6/18/97 $205.00 <br />COFFIN B DEBRIS 13.03 ($364.84) 6/18/97 $142.50 <br />GOFF~N B DEBRIS 12.24 ($342.72) 6/19/97 $142.50 <br />PRIVATE DOORS 62 $496.00 6/18/97 $96.72 <br />PRIVATE DOORS 63 $504.00 6/18/97 $98.28 <br />PRIVATE DOORS 152 $1,250.00 6/20/97 $237.12 <br />PRIVATE IRON $750.00 6/20/97 $0.00 <br />RIVERBEEVD CONC 36 ($18.00) 6/13/97 $142.50 <br />RIVERBEND CONC 144 (~72.OQ) 6/16/97 $570.00 <br />RIVERBEND CONC 136 ($68.00) 6/16/97 $570.00 <br />RlVERk3ENp CONC 72 ($36.00) 6/16/97 $410.00 <br />RIVERBEND CONC 170 ($85.00) 6/17/97 $712.50 <br />RIVERBEND CONC 54 (~27.00) 6/17/97 ~213.75 <br />RIVERBEND CONC 162 ($81.00) 6/17/97 ~641.25 <br />RIVERaEND CONC 153 ($76.50) 6/18/97 $512.50 <br />RIVERBEND CONC 54 ($27.00) 6/18/97 $307.50 <br />RIVERBFND CONC 90 ($45.00) 6/18/97 $512.50 <br />RIVER~END CONC 18 ($9.00) 6/19/97 $142.50 <br />RIVERBEND CONC 18 ($9.00) 6/19/97 ~142.50 <br />RIVERBEND CONC 18 ($9.00) 6/19/97 $142.50 <br />RIVERBEND CONC 36 (~,~8.00) 6/19/97 $142.50 <br />RIVERBEND CONC 54 ($27.00) 6/20/97 $213.75 <br />RIVERBEND CONC 72 ($36.00) 6/20/97 $285.00 <br />SCHNiTZER STEEL 8.97 ~565.11 6/10/97 $365.00 <br />SCHNITZER STEEL 7.2 $453.60 6/12/97 $396.25 <br />SCHNITZER STEEL 11.5 $724.50 6/12/97 $405.00 <br />SCHNITZER STEEL 17.14 $1,079.82 6/13/97 $405.00 <br />SCHNI~1"ZER STEEL 12.$3 $808.29 6/18/97 $385.00 <br />SCHNITZER STEEL 9.43 $594.09 6/18/97 $385.00 <br />SCHN!T7_ER STEEL 11.6 $730.80 6/19/97 $365.00 <br />SCHNiTZER STEEL 9.84 $619.92 6/24/97 $365.00 <br />W VUA~TE ASPHALT 93.3 ($950.00) 6/10/97 $716.25 <br />W WASTE ASPNALT 65.75 ($1,000.00) 6/10/97 $756.25 <br />W WASTE ASPHALT 126.15 ($950.00) 6/10/97 $75G.25 <br />W WASTE CONC 15.6 ($30.00) 6/13/97 $102.50 <br />W WA,STE WOOD 25.38 • ($594.00) 6/19/97 $650.00 <br />W WASTE WOOD 15.98 {~385.00) 6/i 9/97 $325.00 <br />W W~~.~TE WOOD 12.69 ($297.00) 6/19/97 $325.00 <br />W WASTE WOOD 19.03 ($445.50) 6/20/97 $487.50 <br />prepared by: STATON CONSTRUCTION INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.