My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
David Hartwig <br />MARION COUNTY <br />100 High St. N.E. <br />Salem, OR 97301 <br />STATON CONSTRUCTION, INC. <br />29394-B AIRPORT RD. <br />(541)461-0543 <br />RE: DEMOLITION; SALEM COURTHOUSE SQUARE <br />Dear Mr. Hartwig: <br />May 27, 1997 <br />Listed below are submittals as required in Section 01010, 1.1 and 1.4.D., <br />and Section 1313, 1.1 .8., and 1.1 .9.D. of the contract Specifications. <br />01010; 1.1 and 1.4.D. Shoring For Basement Walls To Remain In Place <br />Concrete basement walls to remain in place, subsequent to demolition, will <br />be adequately shored to prevent movement utilizing crushed concrete and <br />brick from on site demolition material. Lateral resistance required to prevent <br />movement or collapse will be calculated by Dennis McGee Engineering of <br />Corvallis, OR. McGee Engineering will inspect all basement walls to remain <br />and provide an engineered, stamped shoring plan by June 16, 1997 for <br />Marion County review and approval. It is anticipated that implementation of <br />the shoring plan will not needed until July 1, 1997, providing ample time for <br />review and approval. <br />1313; 1.1.8 Evidence Of Transportation And Disposal Permits <br />Transportation and disposal permits for demolition debris or other solid waste <br />are not required by local, state or federal regulation. No submittal is <br />necessary for this item. <br />1313: 1.1.9.D. Erosion Control Plan <br />No excavations , embankments, stockpiles or haul roads will be implemented <br />on this project. Work will be performed during June, July and August 1997 <br />virtually eliminating possible rain water infiltration. In the event of rain <br />events, all surface run off will be contained within the project limits by <br />natural geography, preventing off site migration or entry to improved storm <br />systems. No erosion potential exists for this project. No submittal is <br />necessary for this item. <br />EUGENE, OR 97402 9594 <br />FAX 461-0545 <br />DEQ LICENSE k 12407 & 12408 OR CCB # 03371 EPA/DEQ IDN ORD980981237 <br />
The URL can be used to link to this page
Your browser does not support the video tag.