Laserfiche WebLink
Section 00400 <br />Agreement/Contract <br />Page 3 of 3 <br />0 Item 22. The contractor shall pay a fee equal to one-tenth of one percent (.1 percent) of the <br />contract to the Bureau of Labor and Industries. Due on or before the first progress <br />payment or 60 days form the date work first began on the contract, whichever <br />comes first. $518.57 <br />~ Item 24.1 Recovery and Waste Management Ptan <br />^ a. Types of waste materials produced as a result of work performed... <br />^ b. Estimate quantities of waste produced <br />^ c. Identification of materials with the potential to be recycled, reused or <br />salvaged <br />^ d. On-site storage and separation requirements <br />e e. Transportation methods <br />^ f. Destinations for materials <br />^ g. Method for tracking and accounting of materials for meeting 90 percent <br /> recycling goal <br />~ h. Estimated amount paid to Contractor for each material recovered <br />~ I. Estimated cost to get materials to the market <br />CONTRACTOR STATES PRICES CANNOT BE GIVENAT THIS TIME <br />~ j. Estimated cost of transportation and disposal for unrecovered materials <br />CONTRACTOR STATES PRICES ARE STILL BEING NEGOTIATED AND NOT <br />AVAILABLE AT THIS TIME <br />1 <br />