My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEMOLITION MANAGEMENT <br />COURTHOUSE SQUARE PROJECT <br />SALEM OREGON <br />1.0 INTRODUCTION <br />At the request of Marion County, Century West Engineering Corporation (Century West) <br />conducted demolition management activities for the Courthouse Square project in Salem, Oregon <br />(Figure 1). The goal was to provide guidance for the Courthouse Square Project during the <br />demolition of the structures on the block. <br />The demolition management required coordination and communication with Marion County Risk <br />Management, Legal Counsel, Maintenance and Administration Personnel, Staton Construction <br />Company (Staton Construction), Pence Kelly, Century West, City of Salem, State and Local <br />agencies, utilities and other individuals and entities, as needed. <br />Staton Construction began demolishing the Senator, Goldberg, Community Development, Beri, <br />Goodman, and Lui Buildings on May 27`h, 1997, completing demolition on September 25`f', 1997. <br />The following report describes the demolition management activities for the Courthouse Square <br />Project by Marion County personnel; the contractor, Staton Construction; and the project <br />manager, Century West. <br />2.0 SCOPE OF WORK <br />The following scope of work describes the activities Century West performed: <br />2.1 Project Status and Scheduling <br />Century West reviewed the status of the project by reviewing records and <br />documentation and meeting with Marion County and Staton Construction, the <br />contractor involved with the demolition project. <br />Century West interfaced with Marion County and Staton Construction to <br />develop/refine the critical path management plan and work schedule through the <br />completion of the demolition phase. The work schedule was received and <br />approved by Marion County 10 days prior to the start of the demolition process. <br />Century West reviewed Staton Construction's written work plan addressing their <br />strategy for demolition including salvage/recycling, site health and safety plans, and <br />shoring. <br />Demolition Management Page 1 C~~EC 6/4%98 <br />Courthouse Square Project 40R06-001-22 <br />Marion County <br />
The URL can be used to link to this page
Your browser does not support the video tag.