Laserfiche WebLink
Geotechnical Investigation Report Detroit Lake Water Reservoir <br />Detroit, Oregon <br />depth explored. Based on the subsurface conditions encountered, we anticipate that <br />groundwater may be present within the depth of exploration (i.e., less than 17 feet bgs). <br />Based on our discussions with you, the reservoir base will be at an approximate elevation of <br />the existing ground surface. Due to likely presence of topsoil, fill layer, and medium-stiff <br />colluvium, PBS recommends that the soils below the base of the reservoir be over- <br />excavated and replaced with imported granular fill material. The depth of over excavation <br />will be on the order of 4 feet. The over-excavated soils below the top 12 inches should be <br />backfilled with compacted 4 to 6 inch stabilization rock (Section D1.4). The 12 inches <br />immediately below the slab should be filled with compacted aggregate base rock (Section <br />D1.8). The tank base slab can then be placed on top of the aggregate base rock. We <br />understand that you may also lower the level of the tank which may remove the unsuitable <br />soils. We recommend that, at a minimum, a 12-inch layer of aggregate base rock (Section <br />D1.8) be installed below the tank base. <br />We do not anticipate any significant cuts and fills on this site which are greater than 5 feet. <br />Due to the gently sloping nature of the site, the temporary slopes can be cut at 1H:1V. If <br />deeper and/or vertical cuts are desired, a shoring system may be required. <br />Recommendations for the design of the shoring system will be provided, if required. <br />A site-specific seismic analysis in accordance with OSSC Section 1802.6 is presented in <br />Appendix C of this report. As discussed in Appendix C, we do not anticipate any significant <br />seismic hazard at this site. <br />3.2 Foundation Design <br />As discussed earlier, the reservoir will be placed close to the existing ground level at the <br />previous location of the existing tank slab. Based on our field exploration, PBS recommends <br />that the top 4 feet of soil below the new tank slab be over-excavated and replaced with <br />granular fill. <br />We understand that the reservoir will have a ring foundation with base slab on grade. <br />Footings placed on firm native soil or on structural fill should be designed for an allowable <br />bearing capacity of 2,500 pounds per square foot (psf). The recommended allowable <br />bearing pressure can be doubled for short-term loads such as those resulting from wind or <br />seismic forces. We recommend that the footings be at least 24 inches wide. The bottom of <br />exterior footings should be at least 18 inches below the lowest adjacent exterior grade. <br />Based on our analysis, the total post-construction settlement is calculated to be less than <br />one (1) inch with differential settlement of less than a ½ inch over a 50-foot span for <br />proposed reservoir loading. <br />Lateral loads on footings can be resisted by passive earth pressure on the sides of the <br />structures and by friction at the base of the footings. An allowable passive earth pressure of <br />250 pounds per cubic foot (pcf) may be used for footings confined by native soils and new <br />structural fills. Adjacent floor slabs, pavements, or the upper 12-inch depth of adjacent, <br />unpaved areas should not be considered when calculating passive resistance. For footings <br />in contact with native soils, a coefficient of friction equal to 0.35 may be used when <br />calculating resistance to sliding. Both of these numbers contain a factor of safety of 1.5. <br />The footings should be founded below an imaginary line projecting at a 1H:1V slope from <br />the base of any adjacent, parallel utility trenches. The footings must also be embedded so <br />November 23, 2009 <br />Project No. 72852.000 <br />3 <br />