Geotechnical Investigation Report Detroit Lake Water Reservoir <br />Detroit, Oregon <br />maximum dry density, as determined by ASTM D 1557. Backfill placed within 3 feet of the <br />wall should be compacted in lifts less than 6-inches thick using hand-operated tamping <br />equipment (e.g., jumping jack or vibratory plate compactors). If flat work (e.g., sidewalks or <br />pavements) will be placed atop the wall backfill, we recommend that the upper 2 feet of <br />material be compacted to 95 percent of the maximum dry density, as determined by ASTM <br />D 1557. <br />We recommend that wall drains will be installed to prevent buildup of hydrostatic pressures <br />behind the walls. A minimum 12 inch wide zone of drain rock, extending from the base of the <br />wall to within 6-inches of finished grade, should be placed against the back of all retaining <br />walls. Perforated collector pipes should be embedded at the base of the drain rock. The <br />drain rock should meet the requirements provided in Section D1.7 of this report. The <br />perforated collector pipes should discharge at an appropriate location away from the base of <br />the wall. The discharge pipe(s) should not be tied directly into storm water drain systems, <br />unless measures are taken to prevent backflow into the wall’s drainage system. <br />Settlements of up to 1-percent of the wall height commonly occur immediately adjacent to <br />the wall as the wall rotates and develops active lateral earth pressures. Consequently, we <br />recommend that construction of flat work adjacent to retaining walls be postponed at least <br />four weeks after backfilling of the wall, unless survey data indicates that settlement is <br />complete prior to that time. <br />3.5 Seismic Design Criteria <br />PBS completed a site-specific seismic hazard study for this project. This study is included in <br />Appendix C. Results of this analysis indicate that the OSSC 2007 (IBC 2006) Spectra is <br />suitable for the seismic design of the water reservoir. The seismic design criteria, in <br />accordance with the OSSC 2007 (2006 IBC), are summarized in Table 2 below. <br />Table 2: OSSC 2007 (IBC 2006) Seismic Design Parameters <br />Short Period1 Second <br />Maximum Credible Earthquake Spectral AccelerationSs = 0.538 gS1 = 0.217 g <br />Site ClassD <br />Site CoefficientFa = 1.37Fv = 1.966 <br />Adjusted Spectral AccelerationSMS = 0.737 gSM1 = 0.437 g <br />Design Spectral Response Acceleration ParametersSDS = 0.491 gSD1 = 0.285 g <br />Design Spectral Peak Ground Acceleration0.196 g <br />The spectra for 2 and ½ percent damping can be developed by multiplying the 5-percent- <br />damped spectra by 1.2 and 1.5, respectively. The vertical ground acceleration can be taken <br />as 2/3 of the horizontal ground acceleration. <br />3.6 Pavement Design <br />PBS understands that a gravel maintenance road will be constructed along the side of the <br />reservoir. Assuming that a limited number of maintenance vehicles and fire trucks will be <br />used, we recommend that a 12-inch layer of gravel be used to construct this access road. A <br />November 23, 2009 <br />Project No. 72852.000 <br />5 <br />