Laserfiche WebLink
Oregon Department of Environmental Quality <br /> • Dosing tank capacity (gallons) <br /> • Tank volume determined by: Check all that apply, add comments below as needed <br /> ❑Permit Records❑Measured❑ Stamped on Tank❑Other <br /> • Dosing tank material <br /> • Dosing tank appears to be watertight and in good condition ❑Yes ['No <br /> • Dosing tank lid is intact ['Yes ❑No <br /> • Electrical componentsare sealed and watertight Dyes ❑No <br /> • Pump/siphon is functional Dyes ❑No <br /> • Type of Pump ❑Demand dose ❑Time dose <br /> • Pump control mechanism is functional(floats,pressure transducer)Dyes [No <br /> • There is a high water alarm Dyes ❑No <br /> • The high water alarm,(audible and visual)is working Dyes ❑No ❑Not Applicable <br /> • Type of screen <br /> • Screen is clean and free of debris Dyes ❑No-Screen cleaned for this evaluation ❑Yes ❑No <br /> • Scum/sludge present in Dosing tank Dyes ❑No <br /> a Scum layer (inches) Sludge layer (inches) <br /> • Additional Comments: <br /> 5. Soil absorption system <br /> The soil absorption system is a set of trenches that receives effluent from the septic tank and <br /> filters the effluent before it enters the groundwater. <br /> • The septic system has a soil absorption system KYes ❑No ['Unknown <br /> • Was the soil absorption system part of the evaluation?Wes ❑No ❑See.note below <br /> If the soil absorption system was not evaluated,please explain below(for example unable to <br /> locate, client did not authorize this part of the evaluation): <br /> a Absorption distribution NEqual ❑Serial ❑Pressure ❑Equal via pressure <br /> • Absorption lines construction material: <br /> ❑ Gravel and pipe ❑Chamber :Is Tile ❑Polystyrene foam and pipe ❑Other <br /> • Absorption distribution unit(s): ❑dropbox[ihydrosplitter gequal distribution box <br /> S Intact ❑Damaged ❑N/A <br /> • Absorption distribution unit(s)are free of debris or solids ❑Yes [No❑N/A <br /> Page 4 of 8 <br />