My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8581050
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
19-XXXXXX
>
8581050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 9:46:56 AM
Creation date
4/5/2019 11:29:19 AM
Metadata
Fields
Template:
Permits
Permit Address
3141 JEFFERSON SCIO DR SE
Permit City
JEFFERSON
Permit Number
555-19-000917-PRMT-01
Parcel Number
103W12 01200
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-19-000917-PRMT-01 Page 3 of 3 <br /> Schedule Inspections online at www.buildingpermits.oregon.gov or by calling: 1-888-299-2821 or 503-588-5147 <br /> When calling for an inspection, use IVR Number:555029599992 <br /> dada a ued /6/ S r r -;;;ZUZiiitin 4-74r Expiration date 3/4/20 <br /> es .,� � ✓ �. - s� ,� - � r � 4 �� <br /> Wort deserrpttoms, MI AUT 4. 4 TA K&R 0QVo* 1 0.44 (>fA )1S.,H OkI - [NO •IMF ,, c+, *9 - <br /> Q <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above: <br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at: <br /> http://www.deq.state.or.us/wq/onsite/onsite.htm <br /> General Conditions And Requirements For All Permits: <br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is <br /> noted on this permit. Renewal of a permit may be granted if an application for permit renewal is received before <br /> the permit expiration date. Reinstatement of a permit may be granted if an application for permit reinstatement <br /> Is received within one year after the permit expiration date.Transfer of a permit from the permittee to another <br /> person may be granted if an application for permit transfer is received before the permit expiration date and no <br /> other changes to the permit are necessary. <br /> Installation Requirements:The drainfield must be installed in undisturbed native soil. No alterations of the <br /> natural site conditions such as soil removal or filling, or slope/topography alterations within the approval areas <br /> for both the initial and replacement systems are allowed, unless otherwise authorized by the Agent. Do not <br /> install system when soil moisture, high groundwater, adverse weather, or other conditions that could affect the <br /> quality of installation or reliability of the system are present. If such conditions are present and there is a need <br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in <br /> 340-071-0160(9). <br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when <br /> the construction,alteration, or repair of a system for which a permit was issued is completed(except for the <br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the <br /> completed construction after the official notice date, unless the permitting agent elects to waive the inspection <br /> and authorizes the system to be backfilled earlier. Receipt and acceptance of a completed Final Inspection <br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final <br /> inspection. Faxed copies are acceptable for inspection request purposes only. Originals must be received <br /> before a Certificate of Satisfactory Completion can be issued. <br /> System Backfill Requirements:The system is to be backfilled or covered as follows: <br /> *Only after the permitting agent has approved the construction installation, <br /> *or the inspection has been waived <br /> *or the Certificate of Satisfactory Completion(CSC)has been issued by operation of law(where the inspection <br /> has not been conducted within 7 days of notification of completed installation). <br /> Unless otherwise required, it is the system installer's responsibility to backfill the system within 10 days after <br /> inspection and issuance of the CSC. Backfill must be carefully placed to prevent damage to the system.The <br /> backfill must be free of large stones,frozen clumps of earth, masonry,stumps,waste construction materials, or <br /> other materials that could damage the system. Be sure that the untreated building paper,filter fabric, or other <br /> material approved by the agent is completely covering all drain media where required prior to backfill.The <br /> system can be connected to and placed into service once it has been properly backfilled and the CSC has been <br /> issued. <br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated <br /> replacement areas must be protected and kept free of development such as roadways,covering with asphalt or <br /> concrete,filling,cutting,or other soil modifications. <br /> Matthew Puntney Onsite Inspector 3/5/19 <br /> 3/5/19:1:48:00PM Page 3 of 3 ONS_OnsitePermit pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.