My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8598309
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
18-XXXXXX
>
8598309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 10:07:23 AM
Creation date
4/24/2019 9:08:45 AM
Metadata
Fields
Template:
Permits
Permit Address
7795 DOVICH LN SE
Permit City
SALEM
Permit Number
555-18-004136-AUTH
Parcel Number
082W30DB00100
Permit Type
Authorization
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Authorization 555-18-004136-AUTH Page 3 of 3 <br /> bat 3 A4u0d 12: 3/ 9 i .fes r ' ' <br /> �e> .D <br /> Workk sc .. hon,a s <br /> -�m.�� a,��';�,���,���; x a�s gam,-s•�-g �--t �, �,�""'`,.'� s, �-s ���, r ��, 3�"�`_r s�" ;� '� <br /> Note:This Notice does not guarantee satisfactory or continuous operation of the sewage system. Should the system fail,a repair <br /> permit from DEQ is required. <br /> If you disagree with this report,you have the right to apply for an authorization notice denial review.The application for review <br /> must be submitted in writing within 45 days of the report issuance and be accompanied by the review fee in OAR <br /> 340-071-0140(3),Table 9C and any additional information DEQ needs to complete the review. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> the site evaluation report, plans and specifications for the proposed system,specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted, and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable, burdensome or impractical. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> Matthew Puntney Onsite Inspector 4/23/19 <br /> 4/23119:2:20:18PM Page 3 of 3 ONS_OnsiteAuthorization_pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.