Laserfiche WebLink
Septic Permit 555-18-000429-PRMT Page 2 of 3 <br /> Da4teibticateaissUed QSLn'0/201 g 3 - � € �� 1 - �Y r �;„. <br /> `5 r � €s "� z,�.� �'��� -r"a -sem ': �°� - �s ` <br /> Work Descrtpt►on " MIN REP REPL TAN. W11000 GAI=Cf NGR $AMESPOT 35I DRM€Y ,fx-'1 Vr g *f <br /> V-r <br /> x911R_ _ _.... ..._ � ,cO ��_ _ bMy.. Rf,. <br /> The septic tank installation plan is approved as submitted. Please refer to the signed approved site plan dated January 17, <br /> 2018. Any deviation from the approved plans must be authorized by this office prior to installation or the permit may be voided. <br /> TANK RISER: The tank must be installed with watertight risers extending to the ground surface or above. The riser lid must be <br /> gasketed and securely fastened. <br /> EFFLUENT SEWER:The effluent sewer is the pipe from the septic tank to the distribution box. The material required is 3034 or <br /> Schedule 40 pipe with 18-gauge minimum green tracer wire or green metallic tape placed along the pipe. The effluent sewer <br /> shall extend at least five(5)feet from the tank. There must be a minimum difference of eight(8)inches between the invert(flow <br /> line)of the septic tank outlet and the invert of the distribution or drop box outlet. In Equal Distribution,there must be six(6) <br /> inches of fall between the septic tank outlet and the distribution box inlet. In Serial Distribution,there must be two(2)inches of <br /> fall between the septic tank outlet and the drop box inlet. <br /> OBSERVE ALL SETBACKS AND SEPARATION DISTANCES as required by the Department of Environmental Quality rules. A <br /> copy of the DEQ setback requirements is available in our office and online at <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspxunder Rules: Division 71:Table 1. <br /> THE ATTACHED SEPTIC TANK ABANDONMENT FORM MUST BE COMPLETED AND RETURNED TO OUR OFFICE. The <br /> septic system installer must complete and sign the form and attach a copy of the receipt from the septic tank pumping service <br /> for pumping the tank. <br /> MAINTAIN PERMANENT ACCESSto septic tank for pumping and service. The septic tank should be pumped and <br /> inspected by a licensed septic tank service before sludge and scum accumulations reach 30%of the tank liquid <br /> operating volume. Pumping every 3 to 5 years is an average interval. The septic tank is a reservoir for the solid materials <br /> in the sewage waste stream. Excessive accumulation of these solid materials in the septic tank will cause the solids to wash out <br /> of the tank and into the drainfield. This will cause irreversible damage to the drainfield and will eventually lead to a system <br /> failure. <br /> THE APPROVED SEPTIC SYSTEM AREA MUST BE PROTECTEDfrom any vehicular traffic or other sources of soil <br /> compaction. Activities such as excavating or filling, driveway placement, paving or any similar alteration of the natural soil <br /> conditions will adversely affect septic system function and lead to premature system failure. The area must not be subjected to <br /> excessive saturation due to artificial drainage of ground surfaces, driveways,building downspouts or other sources. The areas <br /> of the initial septic system and the future repair system must both be protected. <br /> 5/10/19:10:37:55AM Page 2 of 3 ONS_OnsiteCSC_pr <br />