My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8629226
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
19-XXXXXX
>
8629226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 9:00:43 AM
Creation date
5/21/2019 2:24:37 PM
Metadata
Fields
Template:
Permits
Permit Address
5724 CROOKED FINGER RD NE
Permit City
SCOTTS MILLS
Permit Number
555-19-003195-EVAL
Parcel Number
061E36B 00500
Permit Type
Site Evaluation
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Site Evaluation 555-19-003195-EVAL Page 4 of 4 <br /> ® "'r��WiyJ/rzy4�'*" ,, n <br /> PRIi N #1Et tttS, <br /> 'tirzili.x 4,,. ' �x xra � '..as err ' -r a4 'm+ � ✓ 'rr <br /> . sem" _ �.,�.� <br /> tae r a <br /> .-x._ 4r.�.r�.�:.�"�:g..,..... ��-� .��.,�...-� ��.R..m. . ... .. ...... � "."„, ��'�r... .., <br /> • <br /> geographical area in which the property lies is considered a risk to installation during winter months. <br /> Soil moisture conditions generally preclude construction of the drainfield in the winter months. <br /> A DETAILED SEPTIC SYSTEM STAKEOUT IS REQUIRED prior to the issuance of a septic system <br /> installation permit. A scale drawn, detailed site plan must be submitted with the application for the <br /> installation permit. The stakeout must be inspected on the property and approved before the permit <br /> can be issued. Instructions for the stakeout are attached and are available in our office. <br /> Additional Conditions of Site Approval <br /> 1. This site is approved for the type of disposal system described above. Peak sewage flow into the <br /> system is limited to a maximum of 450 gallons per day, with an average sewage flow of not more than <br /> 225 gallons per day. This is normally sufficient to serve a residence with 4 (four) bedrooms. <br /> Premature failure of the treatment system may occur if either of these flow quantities is exceeded. If, <br /> for some reason, you expect your water use may exceed these flows, it may be advisable to increase <br /> the size of the treatment system. <br /> 2. Any alteration of natural soil conditions (i.e. cutting, logging, or filling) in the acceptable area may <br /> void this approval. Continued disturbance in( the area of the approved test pits is highly discouraged. <br /> 3. Both the initial and replacement disposal areas are to be protected from traffic, livestock and <br /> farming activities, development or other potential disturbance of natural soil conditions. <br /> 4. The area must not be subjected to excessive saturation due to, but not limited to, artificial drainage <br /> of ground surfaces, roads, driveways and building down spouts. <br /> 5. This approval is given on the basis that the parcel described above will not be further partitioned or <br /> subdivided. <br /> 6. Placement of a well within 100 feet of the approved areas may invalidate this approval. <br /> THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system. Please contact <br /> this office when you are ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms <br /> until we issue your permit. <br /> This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the <br /> approved system is constructed under a DEQ construction permit or unless the site is altered without approval from this office. <br /> Alterations/excavations/lot line adjustments made to the site, or placement of wells or utilities,etc.,may invalidate this approval <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9A. A senior DEQ staff person will be assigned the site <br /> evaluation report review application. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy <br /> of the site evaluation report, plans and specifications for the proposed system,specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted, and include the variance fee in OAR 340-071-140 Table 9C. A variance <br /> may only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical <br /> conditions render strict compliance unreasonable, burdensome or impractical. A senior DEQ variance officer will be assigned <br /> the variance application. <br /> Matthew Puntney Onsite Inspector 5/21/19 <br /> CALL BEFORE YOU DIG...ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notfication Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 5/21/19:11:14:11AM Page 4 of 4 ONS_OnsiteEvaluation�r <br />
The URL can be used to link to this page
Your browser does not support the video tag.