Laserfiche WebLink
0?35a ) z_A1iz 6 /WJE S5 . - I (I -aaa,a,a <br /> AX-RT Start-Up Checklist Service Provider J 'C/Z")U9'17 CM-- ).y- <br /> T' ' r9-rn 02 ds�—/9 al? ,, <br /> echnician Start-Up Date Occupancy Date <br /> • <br /> Primary Treatment Other System Components <br /> Septic Tank. [ Disinfection system operating(if installed).. // <br /> Indicate model of Biotube®filter installed in septic tank: ❑• Dispersal equipment operating. �r" <br /> ❑ F10822-148(base inlet model) Controls <br /> EfFTS0444-36V(Schedule 40 outlet pipe) <br /> FTW0444-36V(Type 3034 outlet pipe) Loper timer settings per Appendix 1 in AdvanTex O&M Manual • <br /> fotube filter installed correctly on the septic tank outlet. P 1,AIM-OM-ATX-1 <br /> [ t grade access to Blotube filter. r. <br /> Proper wire size used per Orenco Wire Tables,NCH-PU-PU-3. <br /> IE/Riser lid secured to the septic tank access riseL'e1 wired per manufacturer's wiring diagram. <br /> Al-electrical connections in panel secured. <br /> Secondary Treatment . -, ti]�Control panel functional test,as detailed in the AdvanTex <br /> installation Instructions,has been followed. <br /> AX- Unit ❑ D'al tone verified.(For VCOM panels only.) A'/9 <br /> Transport line has a minimum fall of from septic tank to AX-RT. /a in.per foot(10 mm per m) e fce provider name/number written on"For Service Call"label. <br /> / <br /> �j�{ AX-RT unit installed level and on a stable base• ID/Control panel diagrams left in panel for future review. <br /> RI <br /> Unit is installed in series with or perpendicular to septic tank,or Final/Safety inspection <br /> ❑ Unit 1s installed with correct minimum offset from septic tank <br /> _ (if installed parallel to tank). 1-3All ccess riser hardware Is in place.Lids are secured. <br /> ❑ 4 ft(1.2 m)offset(when no antibuoyancy measures are used). All s se-box lids are secured. <br /> J❑ 6 ft(1.8 m)offset(when antibuoyancy measures are used). Panel circuit breakers are in the"on"position,panel is set for <br /> 2 All piping properly covered and compacted. automatic operation,and panel is latched(or locked if necessary). <br /> Ventil tion System Homeowner's Package <br /> Passive air vent line has minimum 1/8 in.per foot(10 mm per meter) <br /> fall to AX-RT. Homeowner's Package reviewed with homeowner. <br /> [i Passive air vent on AX-RT unit is installed. <br /> 1 Recut umping System Comments <br /> .. �Vats operate. <br /> mp operates in"Manual." ^ u <br /> Q" mp operates in'Automatic." 4) d AT A) _ / 1 a 1cr, <br /> ❑ Pump run amps: /at <br /> ElAl <br /> sem <br /> Pump rest volts: ) [S run volts: / ''r a r - 1 3 ?vo 3 <br /> AX-RT nlfold and Spin Nozzle Operation <br /> Manifold end cap closed. ) 1 <br /> 2--Complete,square spray pattern with full coverage of sheets. L�UU�� a�' n nc Pk f�e tJ/J�t����� <br /> ❑ Manifold pressure: ' ) X i3 h+„ f5 (E-1 <br /> (Typically 3.0-3.5 psi or 20.7-24.1 kPa.) 12, c-i I dy IP , J o, 9 g. <br /> Dis�che a Pumping System(pump discharge only) n <br /> ats operate: b i'S G)4 Jy J'S %p > C h9 <br /> Fl <br /> . 1175nip discharge plumbing connected. 1 SO Pse'c 5'Sur< 61 s(Fr1Al h'+'n <br /> "Off"float adjusted for correct discharge dose to dispersal, I-e w Pre ^i4- t.r14 L .Ls k,:re— <br /> ►1 <br /> 11y ASL !c-1. '' ID, <br /> A.c <br /> ©2011 Orenco Systems®Inc. SCL-ATX-AXRT-0M-1 <br /> Rev.2.0,©09/11 <br />