Laserfiche WebLink
Septic Site Evaluation • <br /> 555-19-003863-EVAL Page 4 of 5 <br /> t y ��� � a • <br /> � <br /> A{ prftYli�tfi�v Its1(21Uc�ttt3li Apoved w <br /> ftlt clrarrl.�rr RI "4 BDRti <br /> - "n f;P:44 x 4 ,044,„a "„ �6if-. z.fiwx.a� .. <br /> (ATTS). Alternative systems are installed where soil,drainage,water table levels or space limitations do not allow for a <br /> Standard system installation. The unit pre-treats the septic tank effluent before it is discharged into the ground. The owner <br /> of a Sand Filter,RGF or ATT system must maintain a service contract witha licensed and certified professional to <br /> service and maintain the onsite system. A service contract must be entered into before the system is installed and must <br /> be maintained until the system is decommissioned. <br /> Specific Requirements <br /> Please refer to the Site Evaluation Worksheet which shows the approved areas and other details of the site visit. <br /> Additional Conditions of Site Approval <br /> 1. This site is approved for the type of disposal system described above. Peak sewage flow into the system isn limited to a <br /> maximum of 450 gallons per day,with an average sewage flow of not more than 225 gallons per day. This is normally <br /> sufficient to serve a single family dwelling with a maximum of four bedrooms. Premature failure of the treatment system <br /> may occur if either of these flow quantities is exceeded. If, for some reason,you expect your domestic household water use <br /> may exceed these flows, it may be advisable to increase the size of the treatment system. <br /> 2. Any alteration of natural soil conditions(i.e. cutting or filling)in the acceptable area may void this approval. <br /> 3. Both the initial and replacement disposal areas are to be protected from traffic, livestock,farming activities, logging, <br /> development or other potential disturbance of natural soil conditions. <br /> 4. The area must not be subjected to excessive saturation due to,but not limited to, artificial drainage of ground surfaces, <br /> roads, driveways and building down spouts. <br /> 5. This approval is given on the basis that the parcel described above will not be further partitioned or subdivided. <br /> 6. Placement of a well within 100 feet of the approved areas may invalidate this approval. <br /> This site approval is valid until the system approved above is constructed in accordance with a Marion County issued <br /> Construction-Installation permit. Technical rule changes shall not invalidate this approval, but may require use of a different <br /> kind of system. The site approval runs with the land and will automatically benefit subsequent owners. <br /> Next Step—Construction-Installation Permit <br /> When you are ready to proceed with system construction, contact our office to get a permit application package. Detailed <br /> plans are required for the system prior to the issuance of the permit. Two sets of plans for the system must be submitted at <br /> the time of application for the installation permit. The permit must be issued by Marion County before you can start <br /> construction. <br /> You can find a list of licensed septic system installers on the DEQ web site <br /> http://www.deq.state.or.us/wq/onsite/sdssearch.asp . Once the plans are submitted they will be reviewed before the <br /> installation permit can be approved and issued. <br /> If you believe that an error was made in the evaluation of your property,you may apply fora Site Evaluation ReportReview. <br /> If you would like to apply for a Variance from one or more of the Onsite Wastewater Treatment and Disposal rules,you may <br /> apply for a Variance. Each review will require a fee. If you are interested in either of these actions, please contact Dan <br /> Wiltse at DEQ for more details before you proceed: <br /> Dan Wiltse, Natural Resource Specialist <br /> DEQ-Westem Region <br /> 165 East 7th Avenue, Suite 100 <br /> Eugene, OR 97401 <br /> 541-687-7436 or WILTSE.Daniel@deq.state.or.us <br /> If you have any questions,please feel free to contact me at 503-365-3165. <br /> CALL BEFORE YOU DIG..JTS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 6/13/19:11:06:57AM Page 4 of 5 ONS_OnsiteEvaluation�fr <br />