My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9079110
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
16-XXXXXX
>
9079110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 9:41:03 AM
Creation date
12/26/2019 3:15:48 PM
Metadata
Fields
Template:
Permits
Permit Address
13100 BLACKBERRY LN NE
Permit City
HUBBARD
Permit Number
555-16-004381-SEP
Parcel Number
041W27DA04303
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 YEAR SINGULAIR SERVICE CONTRACT <br /> SCHEDULE A <br /> 1. System Maintenance and Servicing performed SEMI-ANNUALLY <br /> A. Control Center Service <br /> 1. Check operation of control center <br /> 2. Adjust time clock when required <br /> 3. Check operation of recirculation control panel <br /> B. NR Effluent Recirculation System <br /> 1. Check operation of recirculation pump <br /> 2. Inspect recirculation well&fittings <br /> 3. Test Operation <br /> 4. Set recirculation rate rate @ min/hr <br /> C. Aerator Service <br /> 1. Check aerator operation <br /> 2. Check aerator power consumption <br /> 3. Check aerator air delivery <br /> 4. Clean stainless steel aspirator shaft <br /> 5. Clean aspirator tip <br /> 6. Clean fresh air vent in concrete cover <br /> 7. Inspect aeration chamber contents <br /> D. Clarification Chamber Service <br /> 1. Remove the Bio-Kinetic system <br /> 2. Scrape the clarification chamber <br /> 3. Inspect the Bio-Static sludge return <br /> 4. Inspect outlet coupling <br /> 5. Install a clean Bio-Kinetic system <br /> 6. Fill Blue Crystal feed tube(if installed) <br /> 7. Fill Bio-Neutralizer feed tube(if installed) <br /> E. General Service <br /> 1. Inspect effluent pump chamber <br /> 2. Inspect effluent quality <br /> 3. Inspect outlet line <br /> 4. Inspect ground water relief point(if installed) <br /> 5. Inspect effluent disposal system <br /> F. Maintain disposal field <br /> 1. Visually and olfactory inspect disposal field surface for ponding <br /> 2. Check liquid level in disposal field's monitoring ports <br /> G. Reporting <br /> 1. Report to homeowner any improper system function <br /> and date of correction <br /> 2. Annual report to Regulatory Agency with Regulatory Agency Fee <br /> Homeowner will be Invoiced for Regulatory Agency Fee <br /> Ada Sep&2 yr SINCOIAIR Smite Contract Page I <br />
The URL can be used to link to this page
Your browser does not support the video tag.