My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9082452
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
14-XXXXXX
>
9082452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 2:26:45 PM
Creation date
12/31/2019 4:57:34 PM
Metadata
Fields
Template:
Permits
Permit Address
308 ANKENY HILL RD SE
Permit City
JEFFERSON
Permit Number
555-14-001809-SEP
Parcel Number
093W16 00400
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Marion County Onsite Disposal System Fee Schedule <br /> Effective January I,2014 <br /> Marion DEQ Total Fee <br /> New Site Evaluations w/DEQ <br /> County Fee Surcharge Surcharge <br /> Single Family Dwelling -First Lot $517 $100 $617 <br /> -each add'l lot evaluated during initial visit $466 $100 $566 <br /> Commercial Facility System—First 1,000 Gallons $517 $100 $617 <br /> -Each Additional 500 Gallons $114 - $114 <br /> Total Fee <br /> Construction Installation Permits Fee DEQ w/DEQ <br /> Surcharge Surcharges. <br /> Standard System,Redundant System,Saprolite,Seepage Pit,Steep $652 $100 $752 <br /> Slope, <br /> Alternate Treatment Technologies,Capping Fill,Pressure Distribution, $983 $100 $1083 <br /> Recirculation Gravel Filters,Sand Filter,Tile Dewatering <br /> Gray Water Disposal Sump $290 $100 $390 <br /> Holding Tank $559 $100 $659 <br /> Major Repair *Commercial P/R Requires add'I fees over 1000 gals. $310 $100 $410 <br /> Minor Repair $75 $100 $175 <br /> Major Alteration Permit $652 $100 $752 <br /> Minor Alteration Permit $171 $100 $271 <br /> Permit w/sewage flow> 1000 gallons per day in addition to above,per $62 - $62 <br /> 500 gallons per day <br /> Pump System-in addition to permit fee $41 - $41 <br /> Permit Renewal-Field Visit $336 $100 $436 <br /> Permit Renewal-No Field Visit $26 $100 $126 <br /> Total Fee <br /> Commercial Plan Review Fee - DEQ w/DEQ <br /> Surcharge Surcharge <br /> Gallon/day=601 - 1000 Gallons $248 - $248 <br /> Each 500 Gallons per day above 1000 $41 - $41 <br /> Total Fee <br /> Other Onsite Activities Fee DEQ w/DEQ <br /> Surcharge Surcharge.. <br /> Authorization Notice with Field Visit $404 $100 $504 <br /> Authorization Notice without Field Visit $103 $100 $203 <br /> Pumper Truck Inspection-First Truck $98 - $98 <br /> Pumper Truck Inspection-Additional Truck $50 - $50 <br /> Existing System Report $435 $100 $535 <br /> Mobile Hardship Renewal Inspection $264 $100 $364 <br /> Annual Report Evaluation Fee Holding Tanks/Alternate Systems $50 - $50 <br /> Alternate System Inspection Fee $341 - $341 <br /> Hourly Inspection Rate $67.25 - $67.25 <br /> Reinspection Fee $50 - $50 <br /> Record Review $47 $47 j <br /> Page 2 of 2 <br /> O:WORMS\SEPfICNpplication Packets\S-01 Onsite Appl 01_14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.