Laserfiche WebLink
,r • Ai d (9OO9 , <br /> u u Septic Service <br /> i <br /> 4/4/12 <br /> Sumittals for Slayden Construction Group, Inc <br /> Project: Detroit Dam and Reservoir Minto Fish Collection Facility Rebuild <br /> The following submittal sheets are attached: <br /> 1. Waite Concrete 1,500 Gallon Septic Tank <br /> 2. Waite Concrete 1,000 Gallon Dosing Tank <br /> 3. Fiberglass Access Lids <br /> 4. Access Riser—Perma-Loc <br /> 5. ADH100 Adhesive <br /> 6. MA320 Adhesive <br /> 7. Universal Biotube Pump Vaults <br /> 8. PF Series 4" (100mm)Submersible Effluent Pumps <br /> 9. Duplex Control Panels <br /> 10. Float Switch Assemblies <br /> 11. Discharge Assemblies <br /> 12.Splice Boxes <br /> 13. Air Release Assemblies and Valves <br /> 14. 36" x 4" Reversible Manhole Frame and Cover <br /> 15. Pipe Grommets <br /> 16.Solvent Weld 1 %" Sch 80 PVC Pressure Effluent Line <br /> 17. EZflow Drain Field Material <br /> 503.682.1929 PHONE P.O. Box 1130 Wilsonville, OR 9707D CCB#158246 <br /> 503570.0779 FAX aaffordablesepticservice©yahoocsm DEQ#37918 <br />