Laserfiche WebLink
Det-D_: Jar. and F=-sarvoir Minto Fisc Col1_]_'on 2a- ' + r-/ Rabuc_d <br /> 3 . 1 .1 General Requirements for installation of ai_oelinas <br /> 3.1.1.1 Location <br /> 3 .1.1.2 Pipe Laying and Jointing <br /> 3.1.1.3 Connections to Existing Lines <br /> 3.1.2 Special Requirements <br /> 1.1.4.1 installation of PVC Plastic Piping <br /> 3.1.2.2 Installation of PVC Plastic Pressure Pipe and Fittings <br /> 3.1.2.3 Pipeline Installation Beneath Highway Right-of-Way <br /> 3.1.3 Precast Tank Installation <br /> 3.1.4 Installation of Effluent Pump Package <br /> 3.1.5 Miscellaneous Construction and Installation <br /> 3.1.6 Sewage Absorption Trench Construction <br /> 3.1.7 Installations of Wye Branches <br /> 3.1.8 Installation of Control Panel <br /> 3.2 FIELD QUALITY CONTROL <br /> 3.2.1 Field Tests and Inspections <br /> 3.2.2 Tests for Nonpressure Lines <br /> 3.2.2.1 Leakage Tests <br /> 3.2.2.2 Deflection Testing <br /> 3.2.3 Tests for Pressure Lines <br /> -- End of Section Table of Contents -- <br /> 33 30 00. 00 25-ii <br />