Laserfiche WebLink
• <br /> Alternate Material(s) and/or Method(s)Application <br /> Marion County Public Works <br /> 5155 Silverton Rd NE <br /> Salem OR 97305 <br /> OREGON <br /> Phone:(503)588-5147 Fax:(503)588-7948 E-mail:Building co.marion.or.us <br /> 104.11 Alternative materials,design and methods of construction and equipment. <br /> The provisions of this code are not intended to prevent the installation of any material or to prohibit any <br /> design or method of construction not specifically prescribed by this code, provided that any such alternative <br /> has been approved. An alternative material, design or method of construction shall be approved where the <br /> building official finds that the proposed design is satisfactory and complies with the intent of the provisions <br /> of this code,and that the material, method or work offered is, for the purpose intended,at least the equivalent <br /> of that prescribed in this code in quality,strength,effectiveness,fire resistance,durability and safety. <br /> 104.11.1 Research reports. Supporting data, where necessary to assist in the approval of materials or <br /> assemblies not specifically provided for in this code, shall consist of valid research reports from approved <br /> Sources. <br /> 104.112 Tests. Whenever there is insufficient evidence of compliance with the provisions of this code, or <br /> evidence that a material or method does not conform to the requirements of this code, or in order to <br /> substantiate claims for alternative materials or methods, the building official shall have the authority to <br /> require tests as evidence of compliance to be made at no expense to the jurisdiction. Test methods shall be as <br /> specified in this code or by other recognized test standards. In the absence of recognized and accepted test <br /> methods, the building official shall approve the testing procedures. Tests shall be performed by an approved <br /> agency. Reports of such tests shall be retained by the building official for the period required for retention of <br /> t public records. <br /> PROJECT INFORMATION AND LOCATION <br /> Permit or Activity Number: 55>i Cj-roo$i 3(p — STK <br /> Site Address:4545 Ward Drive NE <br /> Brief Description of Project: <br /> &room classroom addition to an existing elementary school. Multipurpose roam and covered play area addition to existing gym building. <br /> Remodel and seismic Improvements of existing building. <br /> PROPERTY OWNER <br /> Name:Salem Keifer School Paid 24J Phone: ( )503-391-1133 Fax: ) <br /> Address:3a30 State Street City/State/Zip Salem,DR 97301 <br /> APPLICANT—(If Other Than Owner) <br /> Name:Angela Flores,Carlson Veit Junge Adchheds Phone:( )503-390-0281 ofil Fax: ( ) <br /> Address:3995 River Road Ivaco, City/State/Zip Salem. <br /> Relationship to owner:owners conamtanaarchited <br /> DESCRIBE THE REASON FOR THE PROPOSED ALTERNATIVE: <br /> Oregon has adopted new nerd speeds which are in effect and Mn M utilized*wino the transition period OWN.October 1st2019. Evan though the Deer tali wbmN4p this <br /> Pholeel coder the 2014 O980.we do M see lave high Nina the coat currant design wind speeds as they have been datern*ned to man=est*hefwt our reypm <br /> *Ind speeds. We do not WOW.that utilizing the higher des,w*,d apostle for We strWural design'a In the best interest of the own,. <br /> Page I of 2 <br />