My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLA26-023 Staff Decision
Images9
>
Public Works - Planning
>
FOR PUBLIC VIEW ON INTERNET
>
2026
>
Property Line Adjustment
>
PLA26-023 Staff Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2026 2:12:02 PM
Creation date
6/25/2026 2:12:19 PM
Metadata
Fields
Template:
Land Use
Case_Number
26-023
Document_Date
6/25/2026
Land Use Type
Property Line Adjustment
Tax_Lot_Number
091W07C001200
Document_Type
Decision
Site_Address
9603 KARG LN SE
Additional Info
091W07C001300;1400
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attention Property Owner: A land use proposal has been submitted for property near where you live or near property you own <br />elsewhere. State law requires that the county notify property owners within a certain distance from this property. The proposal and <br />address of the property is described in the "Application" section below. The decision in this case does not directly affect the zoning or <br />use of your property. If you object to the decision, refer to the "Appeal" section. If you have questions, contact the staff person listed <br />at the end of this report. <br /> <br />NOTICE OF DECISION <br />PROPERTY LINE ADJUSTMENT CASE NO. 26-023 <br /> <br />APPLICATION: Application of RJM Investments LLC for a property line adjustment to adjust the property lines on a <br />13.96-acre parcel, a 13.8-acre parcel and 1.39-acre parcel to create a 27.81-acre parcel in a EFU (Exclusive Farm Use) <br />zone located at 9603 Karg Ln SE, Aumsville (T9S; R1W; Section 7C; Tax lots 1200, 1300, & 1400). <br /> <br />DECISION: The Planning Director for Marion County has APPROVED the above-listed Property Line Adjustment <br />application subject to certain conditions. <br /> <br />EXPIRATION DATE: Title transfer instruments accomplishing the property adjustments shall be recorded by the <br />applicants with the Marion County Clerk by July 13th, 2028 (two years). The effective period of an approved application <br />may be extended for an additional year subject to approval of an extension (Extension form available from the Planning <br />Division). Additional extensions may not be granted if the regulations under which this decision was granted have <br />changed since the original approval. <br /> <br />WARNING: A decision approving the proposed uses is for land use purposes only. Due to septic, well and drainfield <br />replacement areas, this parcel may not be able to support the proposed activities. To be sure the subject property can <br />accommodate the proposed use the applicant needs to check with the Building Inspection Division, (503) 588-5147. <br /> <br />This decision does not include approval of a building permit. <br /> <br />CONDITIONS: The following conditions must be met before a building permit can be obtained or the approved use <br />established: <br /> <br />1. Property line adjustment deeds shall be recorded with the county clerk meeting requirements identified in <br />ORS 92.190(4). The deeds shall contain the names of the parties, the description of the adjusted lines, references <br />to original recorded documents and signatures of all parties with proper acknowledgment. The deeds shall include <br />a perimeter description of each resulting parcel. This property line adjustment is not complete until the title <br />transfer instruments accomplishing the property adjustments is recorded by the applicants with the <br />Marion County Clerk. <br /> <br />2. Per the Marion County Surveyor’s Office; No survey required for properties greater than ten acres per ORS <br />92.060 (8). Property line adjustment deed(s) shall be recorded with the Marion County Clerk’s Office. Per ORS <br />92.190 (4). <br /> <br />3. Property line adjustment deeds shall be recorded with the Marion County clerk’s office prior to submitting the <br />property line adjustment survey, if a survey is required. Deed recording reference numbers shall be noted on the <br />required survey. The Marion County Surveyor indicated that a survey is not required for the proposal, but should <br /> <br />4. Prior to recording the deeds, the applicants shall obtain any septic review and/or evaluations that may be <br />required from the Marion County Building Inspection Division. <br /> <br />5. The resulting parcels shall significantly conform to the site plan submitted with the proposal. Minor variations are <br />permitted upon review and approval by the Planning Director. <br /> <br />ADDITIONAL CONDITIONS: Once the approved use is established the following conditions must be continually <br />satisfied: <br /> <br />6. After the property line adjustment has been completed, no alteration of property lines shall be permitted without <br />first obtaining approval from the Planning Director.
The URL can be used to link to this page
Your browser does not support the video tag.