Laserfiche WebLink
Onsite Permit 555-20-007133-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555002393456 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> lt,��' <br /> Nl pl = <br /> .s -, 1pfan w"�.hADL?T CTS.,�} Pi..,_..A.... &KITF,S rm.. s • <br /> a'z.v 4vs1 <br /> Conditions of approval <br /> •The system must be installed by the property owner or a licensed sewage disposal business <br /> (installer). <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface. <br /> Twenty-inch minimum diameter if less than 36-in deep. Thirty-inch minimum diameter if greater <br /> than 36-in deep. Maintain access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance <br /> with the construction plan approved by the agent, including any changes made by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must <br /> comply with applicable building, electrical, or other codes.An electrical permit and inspection from <br /> the Department of Consumer and Business Services, Building Codes Division, or the municipality <br /> with jurisdiction, is required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> • <br /> 10/15/20:10:06:11AM Page 2 of 3 ONS_OnsitePermitpr <br />