Laserfiche WebLink
Onsite Permit 555-20-007133-PRMT Page 3 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555002393456 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> t .,.-s1, `�'�`€ z r <br /> Bate l# � Q� �.: 1 e+ � 340414: <br /> y �a�n 3'3 \i �"` '� �'�� irkY �r �� ��7; ��`�Ai�',�'z IM�a/� <br /> sr �, to x p z g3},,3 333 3 s, ®141 a ,u d�.a- \\\ *a kkA ?x <br /> "`J a �.c, ., � 1..('� �r�����c�`� � ° ��� '.X33 A l��� te��� 3 � � �ce� ���,� �cs� <br /> Its • 00,!a 9 t PD` ORis 3 Y s 4 k \\ s <br /> 3 ., t. - ,: f` ` � r ,aXN3 � �b 7 . a a, "ka.*« ' 5 A i <br /> \, g -• F�' Y8 cL �•}�' 'a$ "+4 a 'x' a': ' °rp'• �fi a'. <br /> ..«\«�.�z�''.a� ."��-c,,.s. .�.,.�e,�..�.?`.a`":e<_$°r:?`?'.s'�_. ..���o.° s+��x .1'u«3.3d�F...., '?i.,�' �.....��.�. . r.� a,33,'"e..«�:'�:.k''kd.�,\�i\\ � z?�;... ._..: pH a\ .a... ., .w•. <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above. <br /> Rules,Approved Material Listing; and Database of Licensed Installers can be accessed at: <br /> http://www.deq.state.or.us/wq/onsite/onsite.htm <br /> General Conditions And Requirements For All Permits: <br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is <br /> noted on this permit. Renewal of a permit may be granted if an application for permit renewal is received before <br /> the permit expiration date. Reinstatement of a permit may be granted if an application for permit reinstatement <br /> Is received within one year after the permit expiration date.Transfer of a permit from the permittee to another <br /> person may be granted if an application for permit transfer is received before the permit expiration date and no <br /> other changes to the permit are necessary. <br /> Installation Requirements:The drainfield must be installed in undisturbed native soil. No alterations of the <br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval areas <br /> for both the initial and replacement systems are allowed, unless otherwise authorized by the Agent. Do not <br /> install system when soil moisture, high groundwater, adverse weather, or other conditions that could affect the <br /> quality of installation or reliability of the system are present. If such conditions are present and there is a need <br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in <br /> 340-071-0160(9). <br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when <br /> the construction, alteration, or repair of a system for which a permit was issued is completed(except for the <br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the <br /> completed construction after the official notice date, unless the permitting agent elects to waive the inspection <br /> and authorizes the system to be backfilled earlier. Receipt and acceptance of a completed Final Inspection <br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final <br /> inspection. Faxed copies are acceptable for inspection request purposes only. Originals must be received <br /> before a Certificate of Satisfactory Completion can be issued. <br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting <br /> agent has approved the construction installation,*or the inspection has been waived*or the Certificate of <br /> Satisfactory Completion(CSC)has been issued by operation of law(where the inspection has not been <br /> conducted within 7 days of notification of completed installation). <br /> Unless otherwise required, it is the system installer's responsibility to backfill the system within 10 days after <br /> inspection and issuance of the CSC. Backfill must be carefully placed to prevent damage to the system.The <br /> backfill must be free of large stones,frozen clumps of earth,masonry, stumps,waste construction materials,or <br /> other materials that could damage the system. Be sure that the untreated building paper,filter fabric, or other <br /> material approved by the agent is completely covering all drain media where required prior to backfill.The <br /> system can be connected to and placed into service once it has been properly backfilled and the CSC has been <br /> issued. <br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated <br /> replacement areas must be protected and kept free • .. ent such as roadways, covering with asphalt or <br /> concrete,filling, cutting, or other soil modificati.• <br /> 0 ,0 /v/,f <br /> Kimberlee Aldrich / OnsitelNastewater Specialist 2 10/15/2 <br /> 10/15/20:10:06:11AM Page 3 of 3 ONS_OnsitePermit_pr <br />