My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12337714
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
24-XXXXX
>
12337714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2024 9:39:51 AM
Creation date
8/23/2024 3:08:19 PM
Metadata
Fields
Template:
Permits
Permit Address
8512 SUNNYVIEW RD NE
Permit City
Salem
Permit Number
555-24-004834-AUTH
Parcel Number
072W14 01400
Permit Type
Authorization
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEWER & DRAlNL <br /> Oregon Sewer and Drain LLC-PO Box 1282-Silverton,OR 97381 -503-874-9414-www.oregonsewer.com-ccb#201683 <br /> June 4,2024 <br /> Marion County Building <br /> Attn: Kim Aldrich <br /> 5155 Silverton Rd NE <br /> Salem, OR 97305 <br /> RE: EBC (Emmanuel Bible Church) <br /> 8512 Sunnyview Rd NE <br /> Salem, OR 97305 <br /> Hi Kim, <br /> This letter is in regards to the proposed alterations at the EBC Church Campus.The proposed <br /> remodel is to take the existing (old) sanctuary to convert it into the new Fellowship Hall.This will <br /> replace the original Fellowship Hall located in this building with the remodeled one that is <br /> approximately twice the size of original Fellowship hall.The original Fellowship Hall was sized to <br /> compliment the old sanctuary in size and is part of the existing permitted gpd history. Using this <br /> information we are looking at an approx. capacity increase of 300 people for the occasional <br /> use in the remodeled facility. (original church seating capacity was around 300, now around <br /> 600) <br /> The following information is to show the permitted design flow, the actual flow, and the assumed <br /> flow including the Fellowship Hall remodel. Please review and let me know your thoughts on the <br /> numbers and proposed flow calculations. <br /> Current Permitted Design Flow: Peak 1,478 gpd <br /> Current Actual Flow: May 8th-May 15th, 2024=2,212 gallons over 7 days <br /> Daily Average Flow (1 week average):316 gpd <br /> Daily Attendance for the sample week: <br /> gth_ 13 people <br /> 9th- 157 people <br /> 10th-9 people <br /> 11 th-46 people <br /> 12th- 1272 people (3 separate Sunday services) <br /> 13th-217 people <br /> 14th_473 people <br /> 15th-57 people <br /> Total attendance for the week:2,244 people <br /> 2,244 people /2,212 gallons= average of 1.01 gallons per person <br />
The URL can be used to link to this page
Your browser does not support the video tag.