Laserfiche WebLink
Cyndee Tate <CTate@co.marion.or.us>; Danielle Brown <DBrown@co.marion.or.us>; Matt Knudsen <br /> <MKnudsen@co.marion.or.us>;John Speckman <JSpeckman@co.marion.or.us>;Janelle Cach <br /> <janelle.cach@gmail.com> <br /> Subject: Re: septic for 12233 Secluded place. <br /> e WARNING:This email originated outside of Marion County. <br /> DO NOT CLICK links or attachments unless you trust the sender and know the content is safe. <br /> Kim, <br /> Thanks for taking my phone call,as discussed, let's plan on meeting next Thursday 7/25 to review site conditions, I can send you an invite. <br /> With that said, I think I may have found the source of the confusion. <br /> I will forward the original email I received from John Speckman from my initial inquiry about this property/septic evaluation and the original <br /> attachments John provided that I have marked up with notes and attached along with the email approval by Matt Knudsen. <br /> From what I can see there are three parcels,you can also see on the proposed site plan the proposed septic location on parcel 2(parcel 1 <br /> on lot line PDF). <br /> You can see on the lot line pdf the title references changes to parcels 2&3 but then parcels 1 &2 are labeled in the drawings. <br /> I believe this is the discrepancy,the parcel labeling is incorrect but the location where the septic evaluation took place is on 12233 Secluded <br /> Place which is labeled proposed septic on the site plan. <br /> The site plan submitted by Eric from Timbercraft Homes also shows an existing road which is mislabeled.There is no road,that is the <br /> proposed road and I have included some current photos below. <br /> Proposed Driveway Looking South to house/septic location <br /> x . . <br /> }} <br /> 3 i 1 PP '*F 4€ <br /> • <br /> �... <br /> r s,ligc gym. - <br /> w '- <br /> Approved Septic Area <br /> e, • <br /> ;., n. <br /> ,... �s.... fir:. ..•� <br /> Based on the earlier emails and approvals I proceeded to invest quite a bit upfront cost into design/engineering/well and am scheduled to <br /> close on a construction loan pending building permit. <br /> Would it be possible to proceed with the plan review while we finalize and confirm the septic evaluation documentation?It would be much <br /> appreciated. <br /> I am willing to pay the plan review fee upfront to proceed with review if that helps on any account. <br /> Let me know, I hope this clears up some confusion. <br /> Thanks, <br /> Scott <br />