Laserfiche WebLink
Onsite Permit 555-22-000208-PRMT Page 3 of 4 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555054412627 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> d. <br /> Date,issued:2/25/22' , t Expiration date:2/25/23 <br /> Work description FIRE MAJ REPAIR;REPL 2 BDRM SFD <br /> Conditions of approval <br /> •Dry soil installation only (June 1 —October 1 unless otherwise authorized by the agent). <br /> '•The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must tietested-for watertightness and have a water-tight riser to the ground <br /> surface.Twenty-inch minimum diameter if less than 36-in deep.Thirty-inch minimum <br /> diameter if greater than 36-in deep. Maintain access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> -All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://.www.oregon.gov/deq/Residential/Pages/.Onsite.aspx - <br /> rr•The pump and alarm must be wired on separate circuits in the control panel._P_ump_wirinq <br /> must-comply-with-applicable building, electrical, or other codes.An electrical permit and7 <br /> Linspection from the Department ofConsumerand-Business-Services,Building Codes - <br /> kDivision, or the municipality with iurisdiction,.is required for pump-wiring installation. <br /> minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 2/25/22:9:59:26AM ONS_OnsitePermit_pr <br />