My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12367077
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
12367077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 11:23:23 AM
Creation date
9/10/2024 11:53:48 AM
Metadata
Fields
Template:
Permits
Permit Address
22806 JENNIE RD SE
Permit City
Lyons
Permit Number
555-22-000208-PRMT
Parcel Number
092E18DA00600
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-22-000208-PRMT Page 4 of 4 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555054412627 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued:.2/25/22 E rpiration date:2/25/23 <br /> Work description: FIRE MAJ.,REPAIR REPL 2 BDRM SFD <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above. <br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at: <br /> http://www.deq.state.or.us/wq/onsite/onsite.htm <br /> General Conditions And Requirements For All Permits: <br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is <br /> noted on this permit.Renewal of a permit may be granted if an application for permit renewal is received <br /> before the permit expiration date.Reinstatement of a permit may be granted if an application for permit <br /> reinstatement Is received within one year after the permit expiration date.Transfer of a permit from the <br /> permittee to another person may be granted if an application for permit transfer is received before the permit <br /> expiration date and no other changes to the permit are necessary. <br /> Installation Requirements:The drainfield must be installed in undisturbed native soil.No alterations of the <br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval areas <br /> for both the initial and replacement systems are allowed,unless otherwise authorized by the Agent.Do not <br /> install system when soil moisture,high groundwater,adverse weather,or other conditions that could affect the <br /> quality of installation or reliability of the system are present.If such conditions are present and there is a need <br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in <br /> 340-071-0160(9). <br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when • <br /> the construction,alteration,or repair of a system for which a permit was issued is completed(except for the <br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the • <br /> completed construction after the official notice date,unless the permitting agent elects to waive the inspection <br /> and authorizes the system to be backfilled earlier.Receipt and acceptance of a completed Final Inspection <br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final <br /> inspection.Faxed copies are acceptable for inspection request purposes only.Originals must be received <br /> before a Certificate of Satisfactory Completion can be issued. <br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting <br /> agent has approved the construction installation,*or the inspection has been waived*or the Certificate of <br /> Satisfactory Completion(CSC)has been issued by operation of law(where the inspection has not been <br /> conducted within 7 days of notification of completed installation). <br /> Unless otherwise required,it is the system installer's responsibility to backfill the system within 10 days after <br /> inspection and issuance of the CSC.Backfill must be carefully placed to prevent damage to the system.The <br /> backfill must be free of large stones,frozen clumps of earth,masonry,stumps,waste construction materials, <br /> or other materials that could damage the system.Be sure that the untreated building paper,filter fabric,or <br /> other material approved by the agent is completely covering all drain media where required prior to backfill. <br /> The system can be connected to and placed into service once it has been properly backfilled and the CSC has <br /> been issued. <br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated • <br /> replacement areas must be protected and kept free of developments • as roadways,covering with asphalt <br /> or concrete,filling,cutting,or other soil modifications. <br /> n110Pv1-e t g / e -W I 01 catdet 2 Z�Zt <br /> Kimberlee Aldrich Onsite Wastewater Specialist 2 /25/2 <br /> 2/25/22:9:59:26AM ONS_OnsitePermit pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.