Laserfiche WebLink
Onsite Permit 555-24-006356-PRMT Page 3 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555010169055 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> ton dot •2 fL <br /> Zradese ptia , MO 1 N IE[D 10 ACCOMI /t3 - D a I11i a dM a B <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above. <br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at: <br /> http://www.deq.state.or.us/wq/onsite/onsite.htm <br /> General Conditions And Requirements For All Permits: <br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is <br /> noted on this permit.Renewal of a permit may be granted if an application for permit renewal is received <br /> before the permit expiration date.Reinstatement of a permit may be granted if an application for permit <br /> reinstatement Is received within one year after the permit expiration date.Transfer of a permit from the <br /> permittee to another person may be granted if an application for permit transfer is received before the permit <br /> expiration date and no other changes to the permit are necessary. <br /> Installation Requirements:The drainfield must be installed in undisturbed native soil.No alterations of the <br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval areas <br /> for both the initial and replacement systems are allowed,unless otherwise authorized by the Agent.Do not <br /> install system when soil moisture,high groundwater,adverse weather,or other conditions that could affect the <br /> quality of installation or reliability of the system are present.If such conditions are present and there is a need <br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in <br /> 340-071-0160(9). <br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when <br /> the construction,alteration,or repair of a system for which a permit was issued is completed(except for the <br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the <br /> completed construction after the official notice date,unless the permitting agent elects to waive the inspection <br /> and authorizes the system to be backfilled earlier.Receipt and acceptance of a completed Final Inspection <br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final <br /> inspection.Faxed copies are acceptable for inspection request purposes only.Originals must be received <br /> before a Certificate of Satisfactory Completion can be issued. <br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting <br /> agent has approved the construction installation,*or the inspection has been waived*or the Certificate of <br /> Satisfactory Completion(CSC)has been issued by operation of law(where the inspection has not been <br /> conducted within 7 days of notification of completed installation). <br /> Unless otherwise required,it is the system installer's responsibility to backfill the system within 10 days after <br /> inspection and issuance of the CSC.Backfill must be carefully placed to prevent damage to the system.The <br /> backfill must be free of large stones,frozen clumps of earth,masonry,stumps,waste construction materials, <br /> or other materials that could damage the system.Be sure that the untreated building paper,filter fabric,or <br /> other material approved by the agent is completely covering all drain media where required prior to backfill. <br /> The system can be connected to and placed into service once it has been properly backfilled and the CSC has <br /> been issued. <br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated <br /> replacement areas must be protected and kept free of development such as roadways,covering with asphalt <br /> or concrete,filling,cutting,or other soil modifications. <br /> 1el- 10/,'53- ` <br /> Danielle Brown Onsite Wastewater Inspector 2 8/29/24 <br /> 8/29/24:11:14:15AM ONS_OnsitePermit_pr <br />