Laserfiche WebLink
NORTH MARION HIGH SCHOOL <br /> <br />MODIFIED B I TUME%NG <br /> <br />_PART 3 - EXECUTION <br /> <br />3.81 Roof Preparation <br /> <br />Contractor shall completely remove the ant <br />built-up roof~ base flashing system~ etc., <br />existing wood deck, <br /> <br />re existing <br />down to the <br /> <br />Contractor shall remove only as much roof ng as can be <br />safely replaced and c~pletelY watersealed at the end <br />of the day. <br /> <br />After removal of the existing roof membrane, <br />Contractor shall inspect the existing deck for <br />structural weakness, deterior'ation~ and other <br />deficiencies which must be corrected prior to the new <br />roof application. <br /> <br />No new insulation or roofing will be applied until <br />the existing deck is inspected and approved by the <br />Quality Controller and/or the School District. <br /> <br />be <br /> <br />Any deteriorated or damaged decking shall be <br />brought to the attention of the School District. <br />Replacement shall be at the disgression of the <br />School District with any necessary replacement <br />costs to be born by the District. <br /> <br />Commencement of roofing application ouer any <br />section will denote acceptability by the <br />Contractor of that section and he will be <br />responsible for any corrective work which may be <br />occasioned by his having started over an <br />unsatisfactory surface~ <br /> <br />All surfaces shall be cleaned of debris and of any <br />moisture before proceeding with application of the new <br />roofing materials. <br /> <br />3.82 Roof Installation <br /> <br />A. Apply sheathing paper over the cleared and swept wood deck <br /> in the following manner: <br /> <br />Over the entire surfacer lay one ply of sheathing <br />paper, lapping each sheet at least two inches over the <br />preceding sheet. Nail sufficiently to hold in place. <br /> <br />Over the fastened sheathing paper, Contractor shall <br />mechanicall'Y, fasten the-.~3/4 Inch perlite insulation in the <br />following m&nner: <br /> <br />Install insulation boards with long joints running <br />continuous and short joints staggered. <br /> <br />87514 - 11 <br /> <br /> <br />