Laserfiche WebLink
19865 Hubbard Cut-off NE, Aurora <br />August 19, 1993 <br />Page 3 <br /> <br />22. <br /> <br />23. <br /> <br />The wood stove shall be listed for installation in an alcove. NFPA 211 <br />8-3.2 :... : :... : . <br /> <br />chamber assembly, that have been tested and are listed by a nationally <br />recognized testing laboratory, shall be installed in accordance with the <br />requirements of said listing and the manufacturer's instructions. <br />(R-905) <br /> <br />24. <br /> <br />25. <br /> <br />Woodstoves shall be certified by the Department of Environmental Quality <br />(DEQ) Or the federal Environmental Protection Agency (EPA) that they <br />meet Oregon's clean-burning smoke emission standards in compliance with <br />House Bill 2175 passed by the 1991 Oregon Legislature. <br /> <br />Factory built chimneys shall conform to the conditions of their listing <br />and the manufacturer's instructions. (R-902) <br /> <br />Approval as a result of this plan review or an inspection shall not be <br />construed to be an approval of a violation of the provisions of the dwelling <br />code or of other ordinances of the jurisdiction. Reviews or inspections <br />presuming to give authority to violate or cancel the provisions of the <br />dwelling code or of other ordinances of the jurisdiction shall not be valid. <br /> <br />sf <br /> <br />"APPROVED" only when this sheet is attached to plans <br /> <br /> <br />