Laserfiche WebLink
Marion Cqunty <br /> <br /> OREGON <br />COMMUN[TY DEVELOPMENT <br />DEPARTMENT <br /> <br />NOTICE OF APPROVAL= <br /> <br />EVALUATION REPORT FOR AN <br />ON-SITE SEWAGE DISPOSAL SYSTEM <br /> <br />September 2, 1993 <br /> <br />JOHN M. KAILEY <br />7930 STONE FIELD COURT SE <br />AUMSVILLE, OREGON 97325 <br /> <br />FiLE <br /> <br />SUBJECT: SITE #93-2718, T:SS, R:2W, S~26C <br />SITE ADDRESS= 7940 STONE FIELD CT SE AUMSVILLE, OR 97325 <br /> <br /> Our office has completed the evaluation for the proposed installation of <br />an on-site sewage system. The septic system is proposed to serve a three <br />bedroom residence on the property. <br /> <br /> Based on the results of this study, this area does not appear suitable <br />for a standard on-site sewage system. However, the cite appears suitable for <br />the installation of an alternative SAND FILTER PLUS FULL CAPPING FILL SYSTEMS <br />as described in the attached construction detail and setback sheets. <br /> <br /> This approval is given on the basis that the lot or parcel will not be <br />further partitioned or subdivided and that conditions on this property and on <br />adjacent properties are not altered in any manner which would prohibit the <br />issuance of a permit. Soils in the approved area shall not be altered or <br />modified by cutting, filling, or other developmental activities which would <br />impede the successful operation of the initial or replacement soil absorption <br />systems. Failure to comply with the above items may void this approval. <br /> <br /> This report is not a permit to install the sewaqe system. A ,p~,~ must <br />be obtained before any system construction occurs. A permit may be issued only <br />after the property hac been found to be compatible with applicable LCDC <br />acknowledged local comprehensive land use plan. A Statement of Land Use <br />Compatibility or its equivalent is required before a construction permit can <br />be issued. <br /> <br /> A detailed plot plan, drawn to scale (ex. 1" ~ 60'), must be submitted <br />with the permit application before the construction-installation permit can be <br />issued. The system must be installed by the property owner or a DEQ licensed <br />septic installer. <br /> <br /> This site evaluation report is valid until an on-site sewage system is <br />installed pursuant to the construction permit obtained from this office, or <br />until earlier cancellation pursuant to the Environmental Quality Commission <br />rules. Subject to the above, this report runs with the land and will automati- <br />cally benefit subsequent owners. <br /> <br /> Our office hours are Monday through Friday, 8:00 to 4:30. Please contact <br />our office if you have any questions concerning this report. <br /> <br />LEE A. GRIMES, SOIL SCIENTIST <br /> <br /> <br />