Laserfiche WebLink
Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br />DEPARTMENT <br /> <br />NOTICE OF APPROVAL: <br /> <br />~VALU~TION REPORT FOR AN <br />ON-SITE SEWAGE DISPOSAL SYSTEM <br /> <br />August 31, 1992 <br /> <br />HAROLD M. SMITH <br />9032 SMITH ROAD SE <br />AUMSVILLE, OREGON 97352 <br /> <br /> SUBJECT= SITE #92-2999, T=8S, R:2W, S:24 <br /> SITE ADDRESS: 9150 SMITH ROAD, AUMSVILLE, OREGON 973~2 <br /> <br /> Our office has completed the evaluation of your property for a three <br />bedroom building site in the area you proposed for an on-site sewage system. <br /> <br /> Based on the results of this study, on-site sewage disposal appears <br />feasible for the property. However, site conditions will require the installa- <br />tion of a STANDARD SYSTEM for the original system and a SAND FILTER for the <br />future replacement syetem. These are described in the attached construction <br />detail and setback sheets. <br /> <br /> This approval is given on the basis that the lot or parcel will not be <br />further partitioned or subdivided and that conditions on this property and on <br />adjacent properties are not altered in any manner which would prohibit the <br />issuance of a permit. Soils in the approved area shall not be altered or <br />modified by cutting, filling, or other developmental activities which would <br />impede the successful operation of the initial or replacement soil absorption <br />systems. Failure to comply with the above items may void this approval. <br /> <br /> This report is not a pp.~mit to install the sewaqe s~tem. A permit must <br />be obtained before ~ny ~ystem construction occurs. A permit may be issued only <br />after the property has been found to be compatible with applicable LCDC <br />acknowledged local comprehensive land use plan. A Statement of Land Use <br />compatibility or its equivalent is required before a construction permit can <br />be issued. <br /> <br /> A detailed plot plan, drawn to scale (ex. 1" = 60'), must be submitted <br />with the permit application before the construction-installation permit can be <br />issued. The system must be installed by the property owner or a DEQ licensed <br />septic installer. <br /> <br /> This site evaluation report is valid until an on-site sewage system is <br />installed pursuant to the construction permit obtained from this office, or <br />until earlier cancellation pursuant to the Environmental Quality commission <br />rules, subject to the above, this report runs with the land and will automati- <br />cally benefit subsequent owners. <br /> <br /> Our office hours are ~onday through Friday, 8~00 to 4=30. Please contact <br />our office if you have any questions concerning this report. <br /> <br />Marion County Building Inspection <br />LEE A. GRIMES, SOIL SCIENTIST <br /> <br /> <br />