My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1284671
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
94-XXXXX
>
Permit - 1284671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2011 1:50:12 PM
Creation date
9/3/2003 4:30:15 PM
Metadata
Fields
Template:
Permits
Permit Address
14615 KASEL CT NE
Permit City
Aurora
Permit Number
94-00263
Permit Type
Permit
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Marion County <br /> OREGON <br /> COMMUNITY DEVELOPMENT <br /> DEPARTMENT <br /> <br />DI~RECTOR <br />Craig O. Luedeman <br /> <br />BLtlI~ING INSPECIION <br />(~3) 5~-5147 <br /> <br />PLANNING & <br />~N~ORC~EN~ <br />(~3) <br /> <br />80ARO OF <br /> <br />Randalt Franke <br />Gary Heer <br />Mary Pearmine <br /> <br />ADMINISTRA~VE <br />O~ICER <br />~n Roudybu~h <br /> <br />September 3, 1993 <br /> <br />M~MOP~RDUM <br /> <br />Eudi and Annette Easel <br />14675 Easel Court NE <br />Aurora, Oregon <br /> <br />FROM: <br /> <br />Robert Foster, RS <br /> <br />SUBJECT: Addendum to subdivision approval <br /> Kasel Court Subdivision, Phase 2 <br /> <br />This addendum is to clarify the requirements for issuance of on-site <br />sewage system permits for the lots in the above subdivision. <br /> <br />All conditions stated in my April 25, 1991 letter of approv- <br />al must be met. <br /> <br />In addition, a stakeout of the house and septic system on <br />each lot must be completed prior to issuanc~ of any s~ptlc <br />permi=s. The stakeout must be completed in accordance with <br />the attached instructions. The house site must be placed on <br />the lot after both the initial and replacement septic <br />systems have been physically staked out on the property. <br />Rememi~er that any excavation work downslope of the septic <br />system and in excess of 30 inches deep will require a 25 <br />foot setback to the septic system. An inspection will be <br />made of the property after each stakeout is completed and <br />before each septic permit is issued in the subdivision. <br /> <br />Please submit a copy of the final plat o~ the subdivision to <br />our office. This should reflect the changes in property <br />lines and changes in numbering that have taken place since <br />the preliminary plat was eubm£tt~d for evaluation. <br /> <br />Please call our office if you have any questions. <br />to 4~/~ Monday through Friday. <br /> <br />ROBERT ~OSTER, R~GIST~I~ZD SANITARIAN <br /> <br />Our hours are 8:00 <br /> <br />Senator Building - '220 High Street'NE - Salem, Oregon 9730]-3670 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.