My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12985628
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
12-XXXXX
>
12985628
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 8:00:14 PM
Creation date
7/29/2025 4:15:28 PM
Metadata
Fields
Template:
Permits
Permit Address
53000 BREITENBUSH RD SE
Permit City
Detroit
Permit Number
555-12-05334
Parcel Number
097E20A 00300
Permit Type
Structural
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
32 <br /> 7.0 Floor Attachment Systems <br /> When an intermediate floor system is designed into the FASWALL®Wallforms structure, it is <br /> generally assumed to be of wood. Because these floors do not have components that can <br /> adequately support the dead weight of the subsequent wall assembly above it, the typical design <br /> criterion is to"hang"the floor from the inside of the wall structure. This technique involves the <br /> use of a perimeter rim joist that is secured to the vertical wall by a series of"hooked" 1/2"x 8" <br /> anchor bolts that are cast into the concrete core of the wall through the side of a Wallform(see <br /> Figure 7). <br /> 7.1 Rim Joists and Rim Joist Anchor Bolts <br /> After the location of the rim joist for the floor is laid out on the wall, the locations of the anchor <br /> bolts are also marked on the surface of the Wallforms, on a vertical centerline visually above the <br /> top edge position of the rim joist. The rim joist is then held in position on the wall and the <br /> vertical centerlines of the anchor bolt locations projected and marked through the center of its <br /> width. At these points, 1/2"holes are drilled through the rim joist. <br /> After the holes are drilled through the rim joist, the rim joist is again held in position on the wall <br /> and the holes used as templates to mark the precise locations of the anchor bolts on the <br /> Wallforms. Using a circular"hole-saw" mounted in a 1/2"drill, a 3" diameter hole is cut into the <br /> side of the wallform at each anchor bolt location. The 1/2"x 8" anchor bolts are then affixed, <br /> with nuts and washers through the 1/2"holes in the rim joist. They also may be tied to the rebar <br /> inside the cell. <br /> The rim joist, with anchor bolts affixed, is then positioned on the wall with the"hooked" ends of <br /> the anchor bolts inserted into the 3"diameter holes in the Wallforms. While the rim joist is held <br /> in position, it is secured to the wall with 4"coarse-thread screws. <br /> ShelterWorks General Application and Technical Information (GATI)version 2.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.