My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12985628
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
12-XXXXX
>
12985628
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 8:00:14 PM
Creation date
7/29/2025 4:15:28 PM
Metadata
Fields
Template:
Permits
Permit Address
53000 BREITENBUSH RD SE
Permit City
Detroit
Permit Number
555-12-05334
Parcel Number
097E20A 00300
Permit Type
Structural
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
33 <br /> MARK ANCHOR BOLT POSITIONS <br /> ON WALL ABOVE RIM JOIST <br /> MARK TOP EDGE OF / SECURE RIM JOIST WRH <br /> RIM JOIST ON WALL 33 a'SHEET ROCK SCREWS ^li <br /> MARK TOP CENTER <br /> OFRIMJOIST i <br /> I <br /> PROJECT ANCHOR ROLT <br /> LOCATIONS TO CENTER ( 1 <br /> OF RIM JOIST +j <br /> WHEN CONCRETE IS PLACED. 1 <br /> MAKE CERTAIN THAT IT IS WELL , t <br /> CONSOLIDATED AROUND THE is T .� <br /> CONSOLI BOLT DATED AR THAT \ CSsi k: <br /> COMPLETELY FILLS THE S' ^„k. <br /> DIAMETER HOLE IN THE FORM. <br /> FIGURE 7 <br /> When the concrete is placed, great care should be taken to make sure it is well consolidated <br /> around anchor bolts and that it completely fills the 3"diameter holes in the Wallforms. <br /> 8.0 Filling Wallforms with Cement <br /> 8.1 Inspection <br /> Call the building inspector and/or the licensed engineer to examine and approve the progress of <br /> the installation. NOTE: Local building officials may want special inspections at certain heights <br /> of the wall sections prior to filling. <br /> 8.2 Rebar <br /> All rebar must be in place prior to the cement infilling process. Vertical rebar may be placed <br /> from the top of the wall down into the vertical cells typically being tied or coupled with the <br /> ShelterWorks General Application and Technical Information(GATI)version 2.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.