Laserfiche WebLink
33 <br /> MARK ANCHOR BOLT POSITIONS <br /> ON WALL ABOVE RIM JOIST <br /> MARK TOP EDGE OF / SECURE RIM JOIST WRH <br /> RIM JOIST ON WALL 33 a'SHEET ROCK SCREWS ^li <br /> MARK TOP CENTER <br /> OFRIMJOIST i <br /> I <br /> PROJECT ANCHOR ROLT <br /> LOCATIONS TO CENTER ( 1 <br /> OF RIM JOIST +j <br /> WHEN CONCRETE IS PLACED. 1 <br /> MAKE CERTAIN THAT IT IS WELL , t <br /> CONSOLIDATED AROUND THE is T .� <br /> CONSOLI BOLT DATED AR THAT \ CSsi k: <br /> COMPLETELY FILLS THE S' ^„k. <br /> DIAMETER HOLE IN THE FORM. <br /> FIGURE 7 <br /> When the concrete is placed, great care should be taken to make sure it is well consolidated <br /> around anchor bolts and that it completely fills the 3"diameter holes in the Wallforms. <br /> 8.0 Filling Wallforms with Cement <br /> 8.1 Inspection <br /> Call the building inspector and/or the licensed engineer to examine and approve the progress of <br /> the installation. NOTE: Local building officials may want special inspections at certain heights <br /> of the wall sections prior to filling. <br /> 8.2 Rebar <br /> All rebar must be in place prior to the cement infilling process. Vertical rebar may be placed <br /> from the top of the wall down into the vertical cells typically being tied or coupled with the <br /> ShelterWorks General Application and Technical Information(GATI)version 2.5 <br />