ARCHITECTURE PUNNING INTERIORS <br /> 621 SN Marlson STOOL,Suiw 200 Portland.Omgon 97205 <br /> T 503222.1917 F:503294.0272 hqb1/' <br /> SRG PARTNERSHIP INC <br /> MEMORANDUM <br /> PROJECT NAME. DATE: REVISED DATE: SRC PROJECT No: <br /> CHEMEKETA COMMUNITY COLLEGE <br /> HEALTH SCIENCES COMPLEX 6.24.2011 2813 <br /> TO: . .. FROM: <br /> Jim Trussell,Senior Plans Examiner,Marion County Bjorn Clouten,SRG <br /> SUBJECT: <br /> Roof Guards at Grid AC Turbine Ventilator Enclosure <br /> DISTRIBUTION: ATTACHMENTS. <br /> Jerry Vessello,CCC RFI 717 <br /> Tom McMullen,CCC <br /> Jon Wiener,SRG <br /> The Chemeketa Community College, Heafth Science Complex submitted and approved Contract Documents include a <br /> complete system of roof tie-offs for worker protection. This safety methodology allows workers to access all portions of <br /> the roof with a standardized safety system. <br /> At the TCO review by the building inspector, a recommendation surfaced suggesting a railing should be added to the <br /> parapet wall at Grid AC.The contractor issued RFI 717 to the design team. Our response to that RFI is attached for your <br /> reference. <br /> There are two turbine ventilator access doors and a small air conditioning unit located on the roof at Grid AC. There is 23 <br /> inches of roof space between the units and a low parapet. Beyond the parapet is a lower roof(approximately 5'lower). <br /> We have investigated adding a railing at this location as requested and found the following;The roof parapets are low and <br /> are not designed to accommodate railing support anchorage;Anchoring to the roof slab would decreases worker safety by <br /> encroaching into the access zone;This would reduce the amount of space available to access the units. <br /> Roof tie-off s are an alternate method,enhanced safety system, exceeding the code requirements. To ensure worker <br /> protection Chemeketa Community College will take the following steps: <br /> • Provide 2 harnesses with safety leads to be stored in Mechanical Room 9-235(2050)at the roof access ladder. <br /> • Provide signage at the roof stair to wear safety harness connected to roof tie-off when working at all areas within <br /> 10 feet of the roof edge. <br /> • Provide training to Chemeketa maintenance workers on the use of safety harness and roof tie-off procedures. <br /> Submitted under 2007 Oregon Mechanical Specialty Code 105.1:Modificaitons,and 105.2:Alternative matena( methods, <br /> equipment and appliances,to be approved as installed roof tie off provides an alternate,enhanced safety system, <br /> exceeding the requirement of 2007 Oregon Mechanical Specialty Code 304.11. <br /> This memo is to request a review and approval of the roof tie offs by the Marion County Building Department. <br /> END OF MEMORANDUM <br /> 12:1PraIectst2c3912013 CMmesela Community College Mled HmpRN.Co mmunimllartsW,gxl Memm\Rml Guards Meng doc PAGE 1 OF 1 <br />