Laserfiche WebLink
Backstop NT For Use Beneath Claddings Other Than Dryvit EIFS Specifications DS200 <br /> B. Backstop NT—Smooth <br /> 1. General: Backstop NT—Smooth is used in conjunction with Dryvit Backstop NT—Texture joint treatment <br /> and shall be applied in accordance with current, published Dryvit Backstop NT Application Instructions For <br /> Use Beneath Claddings Other Than Dryvit EIFS, DS300. <br /> 2. Backstop NT—Smooth is ready to use after an initial spin-up using a"Twister"paddle or equivalent mixing <br /> blade, powered by a 1/2 in (12.7 mm) drill,at 450—500 rpm. Do not add cement or any other additive. <br /> 3. Prior to Backstop NT—Smooth application, sheathing joints, including inside and outside corners, shall be <br /> treated with Backstop NT—Texture and Dryvit Grid Tape. All fastener heads shall also be spotted with <br /> Backstop NT—Texture. Refer to Backstop NT Application Instructions For Use Beneath Claddings Other <br /> Than Dryvit EIFS, DS300, for complete details. Allow to dry a minimum of 2 hours or until dry to the touch. <br /> Cool humid conditions will require longer drying time <br /> 4. Apply Backstop NT Smooth over the entire wall surface, including previously treated fasteners and <br /> sheathing joints. Refer to the chart on the Backstop NT Product Data Sheet For Use Beneath Claddings <br /> Other Than Dryvit EIFS, DS806, or Application Instructions For Use Beneath Claddings Other Than Dryvit <br /> EIFS, DS300,for proper tools and respective coverage. <br /> Note:Applications over OSB sheathing requires a minimum of 2 coats of Backstop NT—Smooth or <br /> Spray. Backstop NT—Texture is not recommended for the field of wall application over OSB. <br /> 5.Allow to dry a minimum of 4 hours prior to application of Dryvit AquaFlash or Dryvit Flashing Tape. Allow to <br /> dry a minimum of 24 hours prior to cladding installation. Cool damp weather will require longer drying <br /> times. During cool damp weather, Flashing Tape Surface Conditioner may be necessary for proper <br /> Flashing Tape adhesion. <br /> 6. Install the specified cladding per published installation instructions for the specific cladding being used. <br /> C. Backstop NT—Spray <br /> 1. General: Backstop NT—Spray shall be applied in accordance with current published Dryvit Backstop NT <br /> Application Instructions For Use Beneath Claddings Other Than Dryvit EIFS, DS300. <br /> 2. Backstop NT—Spray is ready to use after an initial spin-up using a"Twister"paddle or equivalent mixing <br /> blade, powered by a 1/2 in(12.7 mm)drill, at 450—500 rpm. Do not add cement or any other additive. <br /> 3.A maximum of 16 oz(473 ml) of clear potable water may be added if required to adjust workability. <br /> 4.Apply a strip of Dryvit Grid Tape over all sheathing joints, including inside and outside corners and trowel <br /> c apply a layer of Backstop NT-Texture over the Dryvit Grid Tape. <br /> 5. Backstop NT—Spray may be applied using airless spray equipment. Refer to Dryvit Backstop NT <br /> Application Instructions For Use Beneath Claddings Other Than Dryvit EIFS, DS300 for complete details. <br /> 6 Apply Backstop NT—Spray over the entire wall surface, including previously treated joints. Refer to the <br /> chart on the Backstop NT Product Data Sheet For Use Beneath Claddings Other Than Dryvit EIFS, <br /> DS806,or Application Instructions For Use Beneath Claddings Other Than Dryvit EIFS, DS300,for proper <br /> tools and respective coverage. <br /> 7.Allow to dry a minimum of 4 hours prior to application of Dryvit AquaFlash or Dryvit Flashing Tape and <br /> adhesively applied EPS insulation board or specified cladding. Cool damp weather will require longer <br /> drying times. During cool damp weather, Flashing Tape Surface Conditioner may be necessary for proper <br /> Flashing Tape adhesion. <br /> 8. Install the specified Dryvit Exterior Insulation and Finish System or specified cladding per published <br /> installation instructions for the specific system or cladding being used. <br /> 3.04 FIELD QUALITY CONTROL <br /> A. The contractor shall be responsible for the proper storage and application of the Dryvit materials. <br /> B. Dryvit assumes no responsibility for on-site inspections or application of its products. <br /> C. The contractor and general contractor shall review and follow the Backstop NT Application Instructions For <br /> UstReneath Claddings Other Than Dryvit EIFS, DS300. <br /> 3.05 CLEANING <br /> A. All excess Dryvit materials shall be removed from the job site by the Contractor in accordance with contract <br /> provisions. <br /> B.All surrounding areas,where Dryvit materials have been installed, shall be left free of debris and foreign <br /> substances resulting from the Contractor's work. <br /> ihre <br />