Laserfiche WebLink
arion Count!i <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br />DEPARTMENT <br /> <br />NOTICE OF AppROVAL: <br /> <br />EVALUATION REPORT FOR AN <br />ON-SITE SEWAG~ DISPOSAL SYSTEM <br /> <br />June 16, 1992 <br /> <br />STEVE PINKEBTON <br />6395 AUMSVILLE HWY SE. <br />SALEM, oREGON 97301 <br /> <br /> SUBJECT: SITE ~92-889, T:SS, B:2W, S:14 <br /> SITE ~DPd~SS: I~DT 11, SANTIAM SPRINGS ESTATES <br /> <br /> O~ office has completed the evaluation of your property for a three <br />bedroom building site in the area you proposed for an on-site sewage system. <br /> Based O~ the results of this study, on-site sewage disposal appears <br />feasible for the property. Approval is for the iBstalla~ion of a STANDARD <br />SEWAGE DISPOS~tL SYSTEM, aS described in the attached construction detail and <br />setback sheets. <br /> <br /> This approval is given on the basis that the lot or pareel will not be <br />furtha~ partitioned er subdivided and that conditions on this p~eperty and on <br />adjacent properties are not altered in any manner which would prohibit the <br />issuance of a permit. Soils in the approved area shall ~ot be altered or <br />modified by cutting, filling, or other ~e=elopmental a~tiVitieS which would <br />impede the successful operation of the initial or repla~ent soil absorption <br />systems. Pailure to comDly with the abo~e items may void this approval. <br /> <br /> ~rt %s not a ~. ~it to install..~he sewaqe system. A oermit mu~t <br />b~ Qbtai~ed b~o~d~v S~te~.gonstruc%ion o~curs. A permit may be issued only <br />after the property has been found to b~ compatible with a~licable LCDC <br />acknowledged local comprehensive land use plan. A ~tatement Of Land Use <br />Compatibility or its equivalent is required before a construction p~rmit can <br />be issued. <br /> <br /> A detailed Dlot plan, drawn to scale (ex. 1" ~ 60'), must be $obmitted <br />with the permit application before the construction-installation permit can be <br />issued. The system must be installed by the property owner or a DEQ licensed <br />septic installer. <br /> <br /> This site evaluation report is valid until an on-site sewage system i~ <br />installed pursuant tO the construction permit obtained from thl~ office~ or <br />until earlier cancellation pursuant to =he Znvironmental Quality Com~issi0n <br />rules. Subject to the above, this report run~ with the land and will automati- <br />cally benefit subsequent owners. <br /> <br /> Our office hours are Monday through Friday, S~00 to 4~30, ~loase contact <br />our office if you have any questions concerning thi~ report. <br /> <br /> fi tion <br />LEE A. GRI~S, SOIL SCIENTIST <br /> <br /> <br />