Laserfiche WebLink
Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br />DEPARTMENT <br /> <br />PILE <br /> <br />NOTICE OF APPROVAL: <br /> <br />EVALUATION REPORT FOR AN <br />ON-SITE SEWAOE DISPOSAL SYSTEM <br /> <br />May 20, 1994 <br /> <br />Daniel & Virginia Clare <br />23764 3rd St. NE <br />Aurora, Oregon 97002 <br /> <br /> SUBJECT: SITE ~94-01818, T:3s, R:lw, S:32 <br /> SITE ADDRESS: 23766 3rd St. NE, Aurora (Butteville) <br /> <br /> Our office has completed the evaluation for the proposed installation of <br />an on-site sewage system. The septic system is proposed to serve a 3 bedroom <br />single family residence on the property. <br /> <br /> Based on the results of this study, on-site sewage disposal appears <br />feasible for the property. Approval is for the installation of a STANDARD <br />SEWAGE DISPOSAL SYSTEM, as described in the attached construction detail and <br />setback sheets. <br /> <br /> This approval is given on the basis that the lot or parcel will not be <br />further partitioned or subdivided and that conditions on this property and on <br />adjacent properties are not altered in any manner which would prohibit the <br />issuance of a permit. Soils in the approved area shall not be altered or <br />modified by cutting, filling, or other developmental activities which would <br />impede the successful operation of the initial or replacement soil absorption <br />systems. Failure to comply with the above items may void this approval. <br /> <br /> This report is not a permit to install the sewaqe system. A permit must <br />be obtained before any system construction occurs. A permit may be issued only <br />after the property has been found to be compatible with applicable LCDC <br />acknowledged local comprehensive land use plan. A Statement of Land Use <br />Compatibility or its equivalent is required before a construction permit can <br />be issued. <br /> <br /> A detailed plot plan, drawn to scale (ex. 1" = 60'), must be submitted <br />with the permit application before the construction-installation permit can be <br />issued. The system must be installed by the property owner or a DEQ licensed <br />septic installer. <br /> <br /> This site evaluation report is valid until an on-site sewage system is <br />installed pursuant to the construction permit obtained from this office, or <br />until earlier cancellation pursuant to the Environmental Quality Commission <br />rules. Subject to the above, this report runs with the land and will automati- <br />cally benefit subsequent owners. <br /> <br /> Ou~office hours are Monday through Friday, 8:00 to 4:30. Please contact <br />our off~~questions concerning this report. <br /> <br />Marion County Building Inspection <br />Robert Foster, Registered Sanitarian <br /> <br /> <br />