Laserfiche WebLink
DATE/TIME <br />TYPE <br /> <br /> MAJOR REPAIR <br />14:57 <br /> <br /> 05/10/99 PERMIT NO 99-03340 <br /> SP STATUS APPLIED <br /> ISSUED 00/00/0000 <br /> TO EXPIRE 10/21/1999 <br /> PAGE 3 <br />installation permit. <br />A CAPPING FILL DRAINFIELD IS REQUIRED in conjunction with <br />the septic system approval, See the attached "CAPPING FILL" <br />information sheet for instructions, <br />CAPPING FILL systems are installed in soils where a layer ~ <br />that limits the effective soild depth or a water table is ~ <br />present in the soil profile at a depth ~hallower than <br />allowed for a standard system. The drainfield is installed a <br />at a very shallow depth and fill is placed over the field to <br />provide the earth cover over the system. CAPPING FILL <br />YSTEMS MAY ONLY BE INSTALLED FROM JUNE 1 AND OCTOBER 1 or <br />during such times when Building Inspection staff finds soil <br />moisture conditions acceptable. See the attached "CAPPING <br />FILL information sheet for instructions. Fill material must <br />be evenly graded over the drainfield and crowned at the <br />center to shed rainfall. <br />An EFFLUENT LIFT PUMP WILL BE REQUIRED to install the septic <br />system disposal field in the approved area and at the <br />required depth. Detailed instructions for dosing tank / <br />effluent pump installations are available in our office. The <br />electrical wiring to the pump and alarm must be installed in <br />accordance with the appropriate Electrical Code. The elec- <br />trical work must be done under a Marion County Electrical <br />Permit and must be inspected and approved by a Marion County <br />Electrical Inspector, The work must be left uncovered and <br />accessible for inspection,The electrical inspection includes <br />the connections to the pump and alarm in the dosing tank,the <br />wiring in the trench and the connections in the structure. <br /> <br /> <br />