My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SESPNEW - 1615015
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
99-XXXXX
>
SESPNEW - 1615015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2010 9:06:03 AM
Creation date
4/3/2005 12:57:56 PM
Metadata
Fields
Template:
Permits
Permit Address
14323 STENBOCK WY NE
Permit City
Aurora
Permit Number
555-99-06082
Parcel Number
041W02D 00602
Permit Type
SESPNEW
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DATE/TIME <br />TYPE <br /> <br /> SEPTIC PERMIT <br /> : 06/02/00 14:35 PERMIT NO 99-06082 <br /> : SP STATUS ISSUED <br /> ISSUED 06/02/2000 <br /> TO EXPIRE 06/02/2001 <br /> PAGE 3 <br />THE APPROVED SEPTIC SYSTEM AREA MUST BE PROTECTED from any <br />vehicular traffic, livestock and farming activities. Other <br />activities such as logging, excavating or filling, driveway <br />placement or any similar activities may also damage the soil <br />in the area and adversely affect the septic system approval. <br />The areas of the initial septic system and the future repair <br />system must both be protected. <br />THIS SYSTEM MUST BE INSPECTED AND APPROVED PRIOR TO BACKFILL <br />When work is complete and ready for inspection, call our <br />Automated Inspection Request line at 273-4427 to request an <br />inspection, Enter the number "801" for a PRE-COVER inspec- <br />tion, You may leave a message for the inspector if desired, <br />Be sure the System Record form with the As-Built drawing is <br />on the job or in our office when the inspection is requested <br />An inspection should be completed within seven (7) days. <br />CAPPING FILL systems are installed in soils where a layer <br />that limits the effective soild depth or a water table is <br />present in the soil profile at a depth shallower than <br />allowed for a standard system. The drainfield is installed a <br />at a very shallow depth and fill is placed over the field to <br />provide the earth cover over the system. CAPPING FILL <br />SYSTEMS MAY ONLY BE INSTALLED FROM JUNE I AND OCTOBER 1 or <br />during such times when Building Inspection staff finds soil <br />moisture conditions acceptable, See the attached "CAPPING <br />FILL" information sheet for instructions, Fill material must <br />be evenly graded over the drainfield and crowned at the <br />center to shed rainfall. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.