Laserfiche WebLink
Decem her 27, 1999 <br /> <br />Attn: Jason Cane <br />Marion County Fire Marshall <br />4760 Portland Road NE <br />Salem, OR 97305--1760 <br />FAX: 503-373-1825 <br /> <br />RE: <br /> <br />North Marion School District Campus <br />Fire Suppression System <br /> <br />Dear Mr. Cane, <br /> <br />[] DLR Group <br /> <br />Architecture and Planning <br />421 SW Sixth Avenue <br />Suite 1212 <br />Portland, OR 97204-1613 <br /> <br />tel 503/274-2675 <br />fax 503/274-O313 <br />portland ~dlrgroup.com <br /> <br />FILE <br /> <br />This is to re-cap our conversation that we had earlier with the Marion County Building Department <br />about your expectations for the system that we are proposing at North Marion School District. To re- <br />iterate, the components of the system will be as follows: <br /> <br />· Seven (7) fire hydrants placed approximately 500' apart along the new fire access road and on <br /> Grim Road between the existing middle and intermediate schools <br />· A 12' ductile iron pipe supplying the hydrants <br />· A 360,000 gallon above ground water tank <br />,, A pump capable of delivering 1500 gpm <br />· The District's existing well and pump hard piped to the tank to replenish the water supply with a <br /> float to detect a drop in the water level <br />· A single draft pipe located at the pump house <br /> <br />We will complete the system by the end of January, 2000 in order to allow continued progress on <br />the construction projects currently underway. Please note that we have also complied with the local <br />fire department requirements ~s follows: <br /> <br />· Installation of fire extinguishers in all work areas at the same distances as indicated for the final <br /> building. <br /> Construction of wall panels at off site locations to minimize on site debris <br />· Daily clean up activities and regular dumping of construction debris containers <br />· Rental of a 21,000 gallon temporary water tank and placement between the two primary <br /> construction areas. <br /> <br />We appreciate the fire department's and County's continued patience while we battle delivery <br />schedules, wet ground conditions, and, at times, adverse weather conditions. We will continue to <br />make the installation of this system our primary focus. <br /> <br />Sincerely, <br />DLR Group <br /> <br />Scott M. Rose, CSI, CDT <br />Pro~'am Manager <br /> <br />RECEIVED <br /> <br /> JAN 0 7 20011 <br />MARION COUNTY <br />BUILDING INSPECTION <br /> <br />REC'D <br /> <br />Portland Appleton Colorado Sprin~ ~ Des Moines Farmington Kansas City <br />Milwaukee Minneapolis Omaha Owlltlll~ll'~'k Philadelphia Phoenix Pierre Seattle Tampa <br /> <br /> DEC 2 1999 <br />RRE MARSHAL'S OFFICE <br /> <br /> <br />