My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1658633
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
Old Files 2
>
Permit - 1658633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2011 12:18:45 PM
Creation date
7/18/2005 9:21:01 AM
Metadata
Fields
Template:
Permits
Permit Address
21599 DOLORES WY NE
Permit City
Aurora
Permit Type
Permit
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO: Martin Boatwright <br />FROM: James V. Soars, D.P.W. <br />RE: Conditional Use 82-9 and <br />May 19, 1982 <br />Page 2 <br /> <br />82-10 <br /> <br />That it shall be the responsibility of the <br />developer to secure all required permits from <br />the State for access to Ehlen Road and the <br />developer will be required to make any improve- <br />ments which the State may require. <br /> <br />This agreement shall be prepared by Mr. Isberg <br />and meet with the approval of Marion County <br />Legal Counsel. <br /> <br />4) Satisfactory evidence of Developer's financial capa- <br /> bility to undertake and complete the contemplated <br /> development. <br /> <br />A signed improvement agreement committing tho developer <br />to complete the required improvements. <br /> <br />None of the above conditions shall relieve the applicant from <br />complying with all items in the Conditional Use Order as iasued <br />by the Marion County Hearings Officer. <br /> <br />In addition, all improvements as shown on the approved plans <br />shall b~ included in an~ building permit approval and be <br />viewed by the Department of Public Works. <br /> <br />At the start of construction please notify Dave Steenson a~ <br />588~5304 before starting. <br /> <br />After construction is completed, furnish a complete set of mylar <br />drawings to this office, showing all revisions and additions to <br />the approved plans. On the first sheet of the mylars, the <br />engineer shall make the following statement: <br /> <br />"I hereby certify that these improvements have <br />been inspected and constructed in conformance <br />with the plans approved by the Public works Director <br />and the general specifications adopted by the Marion <br />County Department of Public Works." <br /> <br />The above statement shall be followed by the engineer's stsmp <br />and signature. <br /> <br />JVS:lk <br />cc: Forrest Jones <br /> Dave Steen$on <br /> Mr. Isberg <br />Enclosure <br /> <br />Senior Civil Engineer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.