My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1658633
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
Old Files 2
>
Permit - 1658633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2011 12:18:45 PM
Creation date
7/18/2005 9:21:01 AM
Metadata
Fields
Template:
Permits
Permit Address
21599 DOLORES WY NE
Permit City
Aurora
Permit Type
Permit
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTi IENT OF PUBLIC WOR S <br /> <br /> $00 $cn~tor ~tt~leting. 2170 High St, .V.£.' Salem. Oregor~ 97301 <br /> <br />MEMORANDUM <br /> <br />February 28, 1983 <br /> <br />TO: Keith Liden, Planning Department <br />FROM: Greg Kurtz, Department of Public Works <br />RE: Conditional Use/Variance 83-11/Isberg <br /> <br />Several of the conditions of approval of Conditional Use Cases 82-9 and 82-10 <br />have not been met. The applicant should be required to fully meet all of those <br />conditions prior to the issuance of a building permit for the proposed con- <br />venience grocery store. The unmet conditions which are of concern to the <br />Department of Public Works are as follows: <br /> <br />The traffic study has not been done. In our letter to Martin <br />Boatwright~ dated 4-12~82 (copy attached) we agreed to allow the <br />study to be delayed if we received an agreement from Mr. Isberg <br />which included the conditions as designated in said letter. Since <br />the proposed convenience grocery store will not produce a very <br />large increase in traffic, the study may be further delayed until <br />application is made for a large traffic generator such as a motel <br />or restaurant, if the agreement iscompleted between Mr, Isberg and <br />the County. " <br /> <br />The right-of-way for Dolores Court has not been dedicated to the <br />public. A warranty deed bearing the names and signatures of all <br />owners, including contract sellers and buyers, is required. <br /> <br />3. The following items pertaining to drainage remain to be completed: <br /> <br /> a) Revised drainage easement documents must be submitted. Easement <br /> documents were submitted, but they did not bear all of the <br /> required signatures and their wording was not entirely acceptable, <br />The top of the existing OSHD' manhole at the intersection of <br />Dolores Court and Ehlen Road must be brought up to the new <br />finished grade. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.