problems. Additionally, it is my understanding that some O and M materials are still outstanding. <br />If this is the case, these items should be addressed immediately. <br />Item #5: Streetscape Medallions - The streetscape medallions were poorly installed and ~'~ ~'~`' <br />' U:C"r~ c;A~ ~ G~C,',•ti~~ <br />the owners and the architect have asked Pence/Keily to resolve the condition either by the Q~ i~(~,cu,~ -C.~' A'~ ~ <br />complete removal (of some or all) of the medallions or by fixing the various medallions' -~ <br />deficiencies. Some repairs have been made, but in the interest of closing out the project, P/I~, ~~+~C ' <br />should aggressively seek a resolution to this matter. <br />Item #6: Infrared Sink Sensors - The sink sensors have been turning faucets on ~~~~~-' <br />~ l ~1f, iti <br />sporadically since their initial installation. I understand that the factory representative has f~ <br />inspected the sensors and intends to install a filter to prevent false sensing. This issue ` <br />initially raised on October 24 and should be resolved by now. ~~~e1,~l,ti~ ~~ <br />~~ ~{G~~.- <br />~~~-v <br />~'~ ~'~ i <br />i~ ~:~4_C- ~V <br />Item #7: Signage - The furnishing and installation of signage ou this project has be _ <br />something less than adequate, to be charitable. Literally, all signs in and around the building (~~ <br />have been installed weeks later than anticipated, and the quality has been marginal. It is my ~~`C~ (1 "`'~ ~` <br />.~j° ~~~ _ <br />understanding that most of the signage has now been installed. It is partially because of the ~ X <br />signage subcontractor's project history that I would encourage Pence Kelly to correct or replace U <br />the commemorative project plaque in the building lobby. The owners strongly feel that the <br />proposal request adequately detailed the finish desired on the plaque. It is my opinion that it was .~~r~"~-'d <br />a lack of product/process knowledge that resulted in an unreadable plaque. The owners approved~ ~ <br />, , ~, ~Zt~ <br />additional funds to ensure a quality plaque and in turn, received a substandard and disappointing <br />work product. <br />By assigning a superintendent to the project in late November, Pence Kelly has demonstrated a <br />genuine desire to bring closure to the numerous outstanding project issues. The updated punch <br />list indicates that most construction related repairs are being completed. It is my hope that this <br />status letter will help the remaining team members focus on the resolution of ongoing issues and <br />help expedite the release of a majority of the remaining project retainage. <br />~ , <br />Craig R. ewis <br />Project Manager <br />CC: David Hartwig - Marion County <br />Bob McCune - Marion County <br />John Whittington - Salem Area Transit <br />Jeff Hamm - Salem Area Transit <br />4 -- ---- r <br />L ~ i :. _ , ~ -___. . <br />!JAN 1 ~ Zu~l <br />..-, ~-- <br />~11,~~",!C' ~ .. -. ~ <br />,~~' !~ F; , . .: . . . ._ ~. i <br />