COR # 33 5 $ (1,081.00) Delete link seal and ESP-1 $ (750) $ (331)
<br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ 1,115 $ 492
<br />COR # 35 5 $ 6,074.00 Revise columns to go to roof level at grids O/11 and O/12 $ 4,213 $ 1,861
<br />COR # 36 5 $ (2,547.00) Revise column type at grid J-10a $ (1,767) $ (780)
<br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ 21,735 $ 9,601
<br />COR # 38 5 $ 790.00 Provide reinforcing at SOG beneath columns $ 548 $ 242
<br />COR # 39 5 $ 2,053.00 Provide added footing and column $ 1,424 $ 629
<br />COR # 40
<br />COR # 41
<br />COR # 42
<br />5
<br />$
<br />(8,962.00)
<br />VE proposal #3-Revise precast panels to mitered corners instead of "U" shape
<br />$
<br />(6,216)
<br />$
<br />(2,746)
<br />COFt # 43
<br />~
<br />"
<br />$
<br />-
<br />COR # 44 5 $ - Provide flourescent lamp revisions ~
<br />COR # 45 5 $ - Provide hollow metal frame revisions $
<br />$ -
<br />398)
<br />(14 $ 361)
<br />(6
<br />COR # 46 11 $ (20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area , ,
<br />COR # 47 5 $ 963.00 Provide floor hardener at rooms 1209, 1219, and 1239 $ 668 $ 295
<br />COR # 48 5 $ 105.00 Change wall mounted water closet to floor mounted water closet in room 1224 $ 73 $ 32
<br />COR # 49 11 $ 7,278.00 Provide insulation at rebar dowels and durometer bearing pad per RFI's 199 and 204 $ 5,048 $ 2,230
<br />COR #50 5 $ 315.00 Remove and dispose of UST adjacent to Church Street $ 315 $ -
<br />COR #51 7 $ 846.00
<br />90 ** Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils $ 67,965 $ 22,881
<br />COR #52 11 $ ,
<br />2,934.00 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 $ 2,035 $ 899
<br />COR #53 5 $ 3,186.00 Revise foundation drain pipe specification $ 2,210 $ 976
<br />COR #54 5 $ 1,210.00 Provide added rebar for pilaster at the SW air shaft $ 839 $ 371
<br />COR #55 8 $ 550.00
<br />23 Upgrade windows to Sungate 1000 at three building faces $ 16,334 $ 7,216
<br />COR #56 5 $ ,
<br />(83.00) Provide changes to glazing $ (58) $ (25)
<br />COR #57 8 $ 1,569.00 Change column in hearing room $ 1,088 $ 481
<br />COR #58 11 $ 1,407,00 Provide changes to gas pressure regulators per PR #21 $ 976 $ 431
<br />COR #59 8 $ 821.00 Added column ties $ 569 $ 252
<br />COR #60
<br />COR #61
<br />8
<br />$
<br />2,107.00
<br />Added rebar on GF1 per shop drawings
<br />$
<br />1,461
<br />$
<br />646
<br />COR #62 8 $ 758.00 Luminar base at flagpole $ 526 $ 232
<br />COR #63 8 $ 310.00
<br />2 Stand pipe changes per PR #3 $ 1,602 $ 708
<br />COR #64 8 $ ,
<br />40,678.00 Added rebar at pour strips
<br />' $
<br />$ 28,214
<br />497)
<br />(2 $
<br />$ 12,464
<br />(1,103)
<br />COR #65 8 $ sand layer
<br />(3,600.00) Delete 2 $ ,
<br />144 $ 64
<br />COR #66 8 $ 208.00 Added steel bracing at canopy $ 412
<br />6 $ 2,833
<br />COR #67 8 $ 9,245.00 Change door frames per PR #31 ,
<br />384 $ 169
<br />COR #68 8 $ 553.00 Owner's job shack phone $ 80 $ 36
<br />COR #69 8 $ 116.00 Provide dowels at east stairwell $
<br />
|