Laserfiche WebLink
COR # 33 5 $ (1,081.00) Delete link seal and ESP-1 $ (750) $ (331) <br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ 1,115 $ 492 <br />COR # 35 5 $ 6,074.00 Revise columns to go to roof level at grids O/11 and O/12 $ 4,213 $ 1,861 <br />COR # 36 5 $ (2,547.00) Revise column type at grid J-10a $ (1,767) $ (780) <br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ 21,735 $ 9,601 <br />COR # 38 5 $ 790.00 Provide reinforcing at SOG beneath columns $ 548 $ 242 <br />COR # 39 5 $ 2,053.00 Provide added footing and column $ 1,424 $ 629 <br />COR # 40 <br />COR # 41 <br />COR # 42 <br />5 <br />$ <br />(8,962.00) <br />VE proposal #3-Revise precast panels to mitered corners instead of "U" shape <br />$ <br />(6,216) <br />$ <br />(2,746) <br />COFt # 43 <br />~ <br />" <br />$ <br />- <br />COR # 44 5 $ - Provide flourescent lamp revisions ~ <br />COR # 45 5 $ - Provide hollow metal frame revisions $ <br />$ - <br />398) <br />(14 $ 361) <br />(6 <br />COR # 46 11 $ (20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area , , <br />COR # 47 5 $ 963.00 Provide floor hardener at rooms 1209, 1219, and 1239 $ 668 $ 295 <br />COR # 48 5 $ 105.00 Change wall mounted water closet to floor mounted water closet in room 1224 $ 73 $ 32 <br />COR # 49 11 $ 7,278.00 Provide insulation at rebar dowels and durometer bearing pad per RFI's 199 and 204 $ 5,048 $ 2,230 <br />COR #50 5 $ 315.00 Remove and dispose of UST adjacent to Church Street $ 315 $ - <br />COR #51 7 $ 846.00 <br />90 ** Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils $ 67,965 $ 22,881 <br />COR #52 11 $ , <br />2,934.00 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 $ 2,035 $ 899 <br />COR #53 5 $ 3,186.00 Revise foundation drain pipe specification $ 2,210 $ 976 <br />COR #54 5 $ 1,210.00 Provide added rebar for pilaster at the SW air shaft $ 839 $ 371 <br />COR #55 8 $ 550.00 <br />23 Upgrade windows to Sungate 1000 at three building faces $ 16,334 $ 7,216 <br />COR #56 5 $ , <br />(83.00) Provide changes to glazing $ (58) $ (25) <br />COR #57 8 $ 1,569.00 Change column in hearing room $ 1,088 $ 481 <br />COR #58 11 $ 1,407,00 Provide changes to gas pressure regulators per PR #21 $ 976 $ 431 <br />COR #59 8 $ 821.00 Added column ties $ 569 $ 252 <br />COR #60 <br />COR #61 <br />8 <br />$ <br />2,107.00 <br />Added rebar on GF1 per shop drawings <br />$ <br />1,461 <br />$ <br />646 <br />COR #62 8 $ 758.00 Luminar base at flagpole $ 526 $ 232 <br />COR #63 8 $ 310.00 <br />2 Stand pipe changes per PR #3 $ 1,602 $ 708 <br />COR #64 8 $ , <br />40,678.00 Added rebar at pour strips <br />' $ <br />$ 28,214 <br />497) <br />(2 $ <br />$ 12,464 <br />(1,103) <br />COR #65 8 $ sand layer <br />(3,600.00) Delete 2 $ , <br />144 $ 64 <br />COR #66 8 $ 208.00 Added steel bracing at canopy $ 412 <br />6 $ 2,833 <br />COR #67 8 $ 9,245.00 Change door frames per PR #31 , <br />384 $ 169 <br />COR #68 8 $ 553.00 Owner's job shack phone $ 80 $ 36 <br />COR #69 8 $ 116.00 Provide dowels at east stairwell $ <br />