Laserfiche WebLink
COR #70 <br />COR #71 <br />COR #72 <br />COR #73 <br />COR #74 <br />COR #75 <br />COR #76 <br />COR #77 <br />COR #78 <br />COR #79 <br />COR #80 <br />COR #81 <br />COR #82 <br />COR #83 <br />COR #84 <br />COR #85 <br />COR #86 <br />COR #87 <br />COR #88 <br />COR #89 <br />COR #90 <br />COR #91 <br />COR #92 <br />COR #93 <br />COR #94 <br />COR #95 <br />COR #96 <br />COR #97 <br />COR #98 <br />COR #99 <br />COR #100 <br />COR #101 <br />COR #102 <br />COR #103 <br />COR #104 <br />COR #105 <br />COR #106 <br />8 $ 371.00 Provide thickened generator slab $ 257 $ 114 <br />8 $ 2,201.00 Provide changes to air intake $ 1,527 $ 674 <br />8 $ (3,318.00) NTE credit on removal of three tanks $ (3,318) $ - <br />8 $ 5,269.00 Provide changes to column base $ 3,655 $ 1,614 <br />9 $ (17.00) Provide revisions to electrical drawings per PR #16 $ (12) $ (5) <br />9 $ 11,157.00 Provide changes to air at rooms per PR #27 $ 7,738 $ 3,419 <br />11 $ - Changes to elevator beams per PR #34 ~ ' $ " <br />9 $ 964.00 Added dowels and shear head $ 669 $ 295 <br />10 $ 82,520.00 Removal and disposal of unsuitable subgrade material $ 57,236 $ 25,284 <br />14 $ 4,607.00 Provide concrete ceiling above switch gear and revise CMU walis per RFI 193 $ 3,195 $ 1,412 <br />9 $ 726.00 Provide two additional 4" conduit sleeves in Data/Com room per PR # 29 $ 504 $ 222 <br />9 $ 677.00 Provide two additional 1" conduits with pull cords per PR # 28 $ 470 $ 207 <br />9 $ 8,960.00 Provide 273 3" conduit sieeves per EC proposal alternate # 32 $ 6,215 $ 2,745 <br />14 $ 877.00 Provide short wall reinforcing at parking garage lobby per RFI 160 $ 608 $ 269 <br />13 $ 21,567.00 Removal and disposal of contaminated soils-359.45 c.y. $ 21,567 $ - <br />11 $ 387.00 Provide additional rebar at south slab step (gridline D) per structural engineer site visit $ 268 $ 119 <br />11 $ 855.00 Provide reinforcing at arcade slab per RFI 297 $ 593 $ 262 <br />11 $ 2,794.00 Provide additional reinforcing and 6" hooks per submittal 2F1 and RFI 328 $ 1,938 $ 856 <br />11 $ 5,558.00 Provide changes to nine columns per RFI 317 $ 3,855 $ 1,703 <br />11 $ 405.00 Provide additional reinforcing for arcade beams per RFI 319 $ 281 $ 124 <br />11 $ 2,139.00 Provide slab continuation at bottom of east and west shafts per RFI 236 $ 1,484 $ 655 <br />14 $ 255.00 Provide changes to exit signs per PR #42 $ ~ ~~ $ 78 <br />14 $ 654.00 Provide electrical power to the tower clock per RFI 233 $ 454 $ 200 <br />12 $ 33,688.00 Removal and disposal of unsuitable subgrade material $ 23,366 $ 10,322 <br />14 $ 294.00 Provide changes to bridge connection detail 9/S6.1.1 per RFI 343 $ 204 $ 90 <br />