Laserfiche WebLink
10/12/99 <br />COR <br />COR #11 <br />COR #41 <br />COR #43 <br />COR #74 <br />COR #80 <br />COR #85 <br />COR #86 <br />COR #90 <br />COR #92 <br />COR #97 <br />COR #104 <br />COR #105 <br />COR #106 <br />COR #107 <br />COR #108 <br />COR #110 <br />COR #115" <br />PROPOSED AMOUNT <br />$265.00 <br />$6,080.00 <br />$8,910.00 <br />$4,505.00 <br />$2,061.00 <br />$4,686.00 <br />$12,354.00 <br />$13,006.00 <br />Pricing To Be Revised <br />Pricing To Be Revised <br />Pricing To Be Revised <br />$80,853.00 <br />$784.00 <br />$475.00 <br />$859.00 <br />$7,192.00 <br />$3,532.00 <br />$145,562.00 <br />Courthouse Square <br />Pending COR's <br />DESCRIPTION OF CHANGE STATUS <br />Door revisions per PR #2 Pending Resolution <br />Provide headers at basement levei 3hr doors Pending Resolution <br />Add duct bank beam and column Pending Resolution <br />Rebar revisions at stairwells per RFI #246 Pending Resolution <br />Provide increased plate sizes per RFI 318 Pending Review <br />Provide additional conduit for swing gater operator per submittal 02710-001 Pending Review <br />Provide changes to door hardware per PR #24 Pending Review <br />Provide tube steel columns @ elv #3 per RFI's 143, 311, 321 Pending Resolution <br />Provide slab over elevator hoistway per RFI's 247 & 248 Pricing To Be Revised <br />Provide revisions to the traffic signalization plan per PR #11 Pricing To Be Revised <br />Provide ceiling above trash room per RFI 329 Pricing To Be Revised <br />Provide and install space saver filing system per PR #41 Pending Review <br />Provide additional rebar at GF per RFI 314-PT cable already on site Pending Resolution <br />Provide additional PT cables and reinforcing adjustments at ramp Pending Review <br />Provide changes to luminaries and electrical connections per PR #18r Pending Review <br />Provide additional reinforcing on flrs 3-5 per structural shop drawing review Pending Review <br />Provide added PT cables at GF pour joints per revised shop drawings Pending Review <br />Pending COR Subtotal <br />* COR #115 includes a delay claim of 8 working days caused by changes in COR's 115 and 64 <br />