Laserfiche WebLink
10/27/99 Courthouse Square <br /> Approved COR / CO Log <br /> COUNTY TRANSIT <br />COR CO APPROVED <br />AMOUNT DESCRIPTION OF CHANGE ALLOCATION A LLOCATION <br />COR # 1 1 $ 530.00 Decomission, removal and disposal of UST encountered on 3-15-99 <br />2 $ 2,530 $ - <br />COR # 2 1 $ , <br />765.00 Resolve gas line conflicts during sewer line relocation <br />1 $ 1,224 $ 541 <br />COR # 4 1 $ , <br />215.00 Removal and disposal of contaminated soils-203.9 c.y. <br />12 $ 12,215 $ _ <br />COR # 5 1 $ , <br />982.00 Decomission, removal and disposal of UST encountered along s. blockface <br />4 $ 4,982 $ <br />COR # 6 1 $ , <br />450.00 Increase compressive strength of footing pads from 3,000 to 5,000 psi <br />3 $ 2,393 $ 1,057 <br />COR # 9 2 $ , <br />16,112.00 Removal and disposal of contaminated soils-268.54 c.y. $ 16,112 <br />475 $ <br />$ - <br />210 <br />COR # 12 2 $ 685.00 Demolition of water vault along Court street $ <br />$ 470 <br />41 $ - <br />COR # 17 2 $ 41,470.00 Removal and disposal of contaminated soils <br />f unsuitable subgrade/fill in areas of unsuitable or contaminated soils <br />ti <br />* E $ , <br />159,414 $ 55,579 <br />COR # 20 <br />COR # 21 3 <br />4 $ <br />$ on o <br />xcava <br />214,993.00 <br />697.00 Removal and disposal of contaminated soils-461.62 c.y. <br />27 $ 27,697 $ - <br />COR # 3 5 $ , <br />135.00 Excavate, remove and dispose of three tanks in the NW corner of the site <br />14 $ 14,135 $ - <br />COR # 7 5 $ , <br />6,966.00 Additional dewatering costs due to overexcavation $ 4,832 <br />938 $ <br />$ 2,134 <br />938 <br />COR # 8 5 <br />5 $ <br />$ 1,876.00 Owner's share of partnering session <br />00 Provide cavity wall insulation at exterior masonry walls of rooms 1209, 1219 and 1239 <br />394 <br />1 $ <br />$ 967 $ 427 <br />COR # 10 <br />COR # 13 5 $ . <br />, <br />(700.00) Delete sump pump at elevator #1 <br />t $ <br />$ (486) <br />986) <br />(12 $ <br />$ (214) <br />737) <br />(5 <br />COR # 18 5 $ em <br />(18,723.00) VE proposal #1-Delete low "E" coating on #3 surface of bus mall glass canopy sys $ , <br />210) <br />(1 $ , <br />(534) <br />COR # 19 5 $ (1,744.00) VE proposal #1-Replace 1600 amp bus duct with conduit and wire for feed to rooftop equip. , <br />3 <br />602 $ 591 <br />1 <br />COR # 22 5 $ 193.00 Provide couplers at top of parking level columns for future north pad development <br />5 $ , , <br />COR # 23 5 $ , <br />(440.00) Delete PT tendon locators $ <br />$ (305) <br />689 $ <br />$ (135) <br />304 <br />COR # 26 5 $ 993.00 Revise column ties after fabrication $ 373 $ 165 <br />COR # 27 5 $ 538.00 Provide column tail revisions $ 613 <br />6 $ 2,921 <br />COR # 29 5 $ 9,534.00 Revise column reinforcement detail $ , <br />925 <br />1 $ 850 <br />COR # 30 5 $ 2,775.00 Provide added rebar at isolation joints $ , <br />(750) $ (331) <br />COR # 33 5 $ (1,081.00) Delete link seal and ESP-1 $ 213 <br />4 $ 861 <br />1 <br />COR # 35 5 $ 6,074.00 Revise columns to go to roof level at grids 0/11 and O/12 $ , <br />767) <br />(1 $ , <br />(780) <br />COR # 36 5 $ (2,547.00) Revise column type at grid J-10a $ , <br />548 $ 242 <br />COR # 38 5 $ 790.00 Provide reinforcing at SOG beneath columns $ 424 <br />1 $ 629 <br />COR # 39 <br />2 5 <br />5 $ <br />$ 2,053.00 Provide added footing and column <br />00) VE proposal #3-Revise precast panels to mitered corners instead of "U" shape <br />962 <br />(8 $ , <br />(6,216) $ (2,746) <br />COR # 4 . <br />, <br />COR # 44 5 $ - Provide flourescent lamp revisions <br />$ <br />- <br />$ <br />COR # 45 5 $ - Provide hollow metal frame revisions $ 668 $ 295 <br />COR # 47 5 $ 963.00 Provide floor hardener at rooms 1209, 1219, and 1239 <br />4 $ 73 $ 32 <br />COR # 48 5 $ 105.00 Change wall mounted water closet to floor mounted water closet in room 122 <br />COR #50 5 $ 315.00 Remove and dispose of UST adjacent to Church Street $ <br />$ 315 <br />2 <br />210 $ <br />$ <br />976 <br />COR #53 5 $ 3,186.00 Revise foundation drain pipe specification $ ~ <br />839 $ 371 <br />COR #54 5 $ 1,210.00 Provide added rebar fo~ pilaster at the SW air shaft $ (58) $ (25) <br />COR #56 5 $ (83.00) Provide changes to glazing <br />arallel parking stalls w/ covered walkway -relocate future job trailers to Church <br />ovide six <br />00 P <br />437 $ 22,498 $ 9,939 <br />COR # 28 6 $ p <br />r <br />. <br />32, <br />