<br />COR # 1 1 $ 530.00 Decomission, removal and disposal of UST encountered on 3-15-99
<br />2 $ 2,530 $ -
<br />COR # 2 1 $ ,
<br />765.00 Resolve gas line conflicts during sewer line relocation
<br />1 $ 1,224 $ 541
<br />COR # 4 1 $ ,
<br />215.00 Removal and disposal of contaminated soils-203.9 c.y.
<br />12 $ 12,215 $ _
<br />COR # 5 1 $ ,
<br />982.00 Decomission, removal and disposal of UST encountered along s. blockface
<br />4 $ 4,982 $
<br />COR # 6 1 $ ,
<br />450.00 Increase compressive strength of footing pads from 3,000 to 5,000 psi
<br />3 $ 2,393 $ 1,057
<br />COR # 9 2 $ ,
<br />16,112.00 Removal and disposal of contaminated soils-268.54 c.y. $ 16,112
<br />475 $
<br />$ -
<br />210
<br />COR # 12 2 $ 685.00 Demolition of water vault along Court street $
<br />$ 470
<br />41 $ -
<br />COR # 17 2 $ 41,470.00 Removal and disposal of contaminated soils
<br />f unsuitable subgrade/fill in areas of unsuitable or contaminated soils
<br />ti
<br />* E $ ,
<br />159,414 $ 55,579
<br />COR # 20
<br />COR # 21 3
<br />4 $
<br />$ on o
<br />xcava
<br />214,993.00
<br />697.00 Removal and disposal of contaminated soils-461.62 c.y.
<br />27 $ 27,697 $ -
<br />COR # 3 5 $ ,
<br />135.00 Excavate, remove and dispose of three tanks in the NW corner of the site
<br />14 $ 14,135 $ -
<br />COR # 7 5 $ ,
<br />6,966.00 Additional dewatering costs due to overexcavation $ 4,832
<br />938 $
<br />$ 2,134
<br />938
<br />COR # 8 5
<br />5 $
<br />$ 1,876.00 Owner's share of partnering session
<br />00 Provide cavity wall insulation at exterior masonry walls of rooms 1209, 1219 and 1239
<br />394
<br />1 $
<br />$ 967 $ 427
<br />COR # 10
<br />COR # 13 5 $ .
<br />,
<br />(700.00) Delete sump pump at elevator #1
<br />t $
<br />$ (486)
<br />986)
<br />(12 $
<br />$ (214)
<br />737)
<br />(5
<br />COR # 18 5 $ em
<br />(18,723.00) VE proposal #1-Delete low "E" coating on #3 surface of bus mall glass canopy sys $ ,
<br />210)
<br />(1 $ ,
<br />(534)
<br />COR # 19 5 $ (1,744.00) VE proposal #1-Replace 1600 amp bus duct with conduit and wire for feed to rooftop equip. ,
<br />3
<br />602 $ 591
<br />1
<br />COR # 22 5 $ 193.00 Provide couplers at top of parking level columns for future north pad development
<br />5 $ , ,
<br />COR # 23 5 $ ,
<br />(440.00) Delete PT tendon locators $
<br />$ (305)
<br />689 $
<br />$ (135)
<br />304
<br />COR # 26 5 $ 993.00 Revise column ties after fabrication $ 373 $ 165
<br />COR # 27 5 $ 538.00 Provide column tail revisions $ 613
<br />6 $ 2,921
<br />COR # 29 5 $ 9,534.00 Revise column reinforcement detail $ ,
<br />925
<br />1 $ 850
<br />COR # 30 5 $ 2,775.00 Provide added rebar at isolation joints $ ,
<br />(750) $ (331)
<br />COR # 33 5 $ (1,081.00) Delete link seal and ESP-1 $ 213
<br />4 $ 861
<br />1
<br />COR # 35 5 $ 6,074.00 Revise columns to go to roof level at grids 0/11 and O/12 $ ,
<br />767)
<br />(1 $ ,
<br />(780)
<br />COR # 36 5 $ (2,547.00) Revise column type at grid J-10a $ ,
<br />548 $ 242
<br />COR # 38 5 $ 790.00 Provide reinforcing at SOG beneath columns $ 424
<br />1 $ 629
<br />COR # 39
<br />2 5
<br />5 $
<br />$ 2,053.00 Provide added footing and column
<br />00) VE proposal #3-Revise precast panels to mitered corners instead of "U" shape
<br />962
<br />(8 $ ,
<br />(6,216) $ (2,746)
<br />COR # 4 .
<br />,
<br />COR # 44 5 $ - Provide flourescent lamp revisions
<br />$
<br />-
<br />$
<br />COR # 45 5 $ - Provide hollow metal frame revisions $ 668 $ 295
<br />COR # 47 5 $ 963.00 Provide floor hardener at rooms 1209, 1219, and 1239
<br />4 $ 73 $ 32
<br />COR # 48 5 $ 105.00 Change wall mounted water closet to floor mounted water closet in room 122
<br />COR #50 5 $ 315.00 Remove and dispose of UST adjacent to Church Street $
<br />$ 315
<br />2
<br />210 $
<br />$
<br />976
<br />COR #53 5 $ 3,186.00 Revise foundation drain pipe specification $ ~
<br />839 $ 371
<br />COR #54 5 $ 1,210.00 Provide added rebar fo~ pilaster at the SW air shaft $ (58) $ (25)
<br />COR #56 5 $ (83.00) Provide changes to glazing
<br />arallel parking stalls w/ covered walkway -relocate future job trailers to Church
<br />ovide six
<br />00 P
<br />437 $ 22,498 $ 9,939
<br />COR # 28 6 $ p