COR #51 7 $ 846.00 "" Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils
<br />90 $ 67,965 $ 22,881
<br />COR # 24 8 $ ,
<br />5,292.00 Slab transition revisions $
<br />$ 3,671
<br />16
<br />334 $
<br />$ 1,621
<br />216
<br />7
<br />COR #55 8 $ 23,550.00 Upgrade windows to Sungate 1000 at three building faces ,
<br />1
<br />088 $ ,
<br />481
<br />COR #57 8 $ 1,569.00 Change column in hearing room $
<br />$ ,
<br />569 $ 252
<br />COR #59 8 $ 821.00 Added column ties $ 461
<br />1 $ 646
<br />COR #61 8 $ 2,107.00 Added rebar on GF1 per shop drawings $ ,
<br />526 $ 232
<br />COR #62 8 $ 758.00 Luminar base at flagpole $ 602
<br />1 $ 708
<br />COR #63 8 $ 2,310.00 Stand pipe changes per PR #3 $ ,
<br />28
<br />214 $ 12,464
<br />COR #64 8 $ 40,678.00 Added rebar at pour strips
<br />' $ ,
<br />497)
<br />(2 $ (1,103)
<br />COR #65 8 $ (3,600.00) sand layer
<br />Delete 2 $ ,
<br />144 $ 64
<br />COR #S6 8 $ 208.00 Added steel bracing at canopy $ 6
<br />412 $ 2,833
<br />COR #67 8 $ 9,245.00 Change door frames per PR #31 $ ,
<br />384 $ 169
<br />COR #68 8 $ 553.00 Owner's job shack phone $ 80 $ 36
<br />COR #69 S $ 116.00 Provide dowels at east stairwell $ 257 $ 114
<br />COR #70 8 $ 371.00 Provide thickened generator slab $ 527
<br />1 $ 674
<br />COR #71 8 $ 2,201.00 Provide changes to air intake $ ,
<br />318)
<br />(3 $ -
<br />COR #72 8 $ (3,315.00) NTE credit on removal of three tanks $ ,
<br />655
<br />3 $ 1,614
<br />COR #73 8 $ 5,269.00 Provide changes to column base $ ,
<br />~ ~ 5
<br />~ $ 492
<br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ ~
<br />735
<br />21 $ 9,601
<br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ ,
<br />(12) $ (5)
<br />COR #75 9 $ (17.00) Provide revisions to electrical drawings per PR #16 $ 738
<br />7 $ 3,419
<br />COR #76 9 $ 11,157.00 Provide changes to air at rooms per PR #27 $ ,
<br />669 $ 295
<br />COR #78 9 $ 964.00 Added dowels and shear head $ 504 $ 222
<br />COR #82 9 $ 726.00 Provide two additional 4" conduit sleeves in Data/Com room per PR # 29 20~
<br />COR #83 9 $ 677.00 Provide two additional 1" conduits with pull cords per PR # 28 $ 4~~
<br />215
<br />6 $
<br />$ 745
<br />2
<br />COR #84 9 $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal alternate # 32 $
<br />$ ,
<br />236
<br />57 $ ,
<br />284
<br />25
<br />COR #79 10 $ 82,520.00 Removal and disposal of unsuitable subgrade material , $ ,
<br />COR # 31 11 $ - Provide modifications to public works package per City's requirements $ -
<br />195
<br />3 $ 412
<br />1
<br />COR # 32 11 $ 4,607.00 Provide access hatch and revisions to plumbing and sprinkler system $ ,
<br />398
<br />14 $ ,
<br />361)
<br />(6
<br />COR # 46 11 $ (20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area
<br />' $ )
<br />,
<br />(
<br />5
<br />048 $ ,
<br />230
<br />2
<br />COR # 49 11 $ 278.00
<br />7 s 199 and 204
<br />Provide insulation at rebar dowels and durometer bearing pad per RFI $ , ,
<br />COR #52 11 $ ,
<br />934.00
<br />2 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 $ 2,035 $ 899
<br />COR #58 11 $ ,
<br />1,407.00 Provide changes to gas pressure regulators per PR #21 $ 976 $
<br />$ 431
<br />COR #77 11 $ - Changes to elevator beams per PR #34
<br />it
<br />i
<br />i $
<br />$ -
<br />268 $ 119
<br />COR #89 11 $ 387.00 te v
<br />s
<br />Provide additional rebar at south slab step (gridline D) per structural engineer s
<br />COR #93 11 $ 855.00 Provide reinforcing at arcade slab per RFI 297 $ 593
<br />938
<br />1 $
<br />$ 262
<br />856
<br />COR #94 11 $ 2,794.00 Provide additional reinforcing and 6" hooks per submittal 2F1 and RFI 328 $ ,
<br />55 $ 703
<br />1
<br />COR #95 11 $ 5,558.00 Provide changes to nine columns per RFI 317 $
<br />$ 3,8
<br />281 $ ,
<br />124
<br />COR #96 11 $ 405.00 Provide additional reinforcing for arcade beams per RFI 319 84 $ 655
<br />COR #99 11 $ 2,139.00 Provide slab continuation at bottom of east and west shafts per RFI 236 $ 1,4
<br />366
<br />23 $ 10
<br />322
<br />COR #102 12 $ 33,688.00 Removal and disposal of unsuitable subgrade material $
<br />$ ,
<br />21
<br />567 $ ,
<br />-
<br />COR #88 13 $ 21,567.00 Removal and disposal of contaminated soils-359.45 c.y. $ ,
<br />945 $ 417
<br />COR # 14 14 $ 1,362.00 Provide ductwork and supply fan revisions per PR #1