COR #51 7 $ 846.00 "" Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils <br />90 $ 67,965 $ 22,881 <br />COR # 24 8 $ , <br />5,292.00 Slab transition revisions $ <br />$ 3,671 <br />16 <br />334 $ <br />$ 1,621 <br />216 <br />7 <br />COR #55 8 $ 23,550.00 Upgrade windows to Sungate 1000 at three building faces , <br />1 <br />088 $ , <br />481 <br />COR #57 8 $ 1,569.00 Change column in hearing room $ <br />$ , <br />569 $ 252 <br />COR #59 8 $ 821.00 Added column ties $ 461 <br />1 $ 646 <br />COR #61 8 $ 2,107.00 Added rebar on GF1 per shop drawings $ , <br />526 $ 232 <br />COR #62 8 $ 758.00 Luminar base at flagpole $ 602 <br />1 $ 708 <br />COR #63 8 $ 2,310.00 Stand pipe changes per PR #3 $ , <br />28 <br />214 $ 12,464 <br />COR #64 8 $ 40,678.00 Added rebar at pour strips <br />' $ , <br />497) <br />(2 $ (1,103) <br />COR #65 8 $ (3,600.00) sand layer <br />Delete 2 $ , <br />144 $ 64 <br />COR #S6 8 $ 208.00 Added steel bracing at canopy $ 6 <br />412 $ 2,833 <br />COR #67 8 $ 9,245.00 Change door frames per PR #31 $ , <br />384 $ 169 <br />COR #68 8 $ 553.00 Owner's job shack phone $ 80 $ 36 <br />COR #69 S $ 116.00 Provide dowels at east stairwell $ 257 $ 114 <br />COR #70 8 $ 371.00 Provide thickened generator slab $ 527 <br />1 $ 674 <br />COR #71 8 $ 2,201.00 Provide changes to air intake $ , <br />318) <br />(3 $ - <br />COR #72 8 $ (3,315.00) NTE credit on removal of three tanks $ , <br />655 <br />3 $ 1,614 <br />COR #73 8 $ 5,269.00 Provide changes to column base $ , <br />~ ~ 5 <br />~ $ 492 <br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ ~ <br />735 <br />21 $ 9,601 <br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ , <br />(12) $ (5) <br />COR #75 9 $ (17.00) Provide revisions to electrical drawings per PR #16 $ 738 <br />7 $ 3,419 <br />COR #76 9 $ 11,157.00 Provide changes to air at rooms per PR #27 $ , <br />669 $ 295 <br />COR #78 9 $ 964.00 Added dowels and shear head $ 504 $ 222 <br />COR #82 9 $ 726.00 Provide two additional 4" conduit sleeves in Data/Com room per PR # 29 20~ <br />COR #83 9 $ 677.00 Provide two additional 1" conduits with pull cords per PR # 28 $ 4~~ <br />215 <br />6 $ <br />$ 745 <br />2 <br />COR #84 9 $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal alternate # 32 $ <br />$ , <br />236 <br />57 $ , <br />284 <br />25 <br />COR #79 10 $ 82,520.00 Removal and disposal of unsuitable subgrade material , $ , <br />COR # 31 11 $ - Provide modifications to public works package per City's requirements $ - <br />195 <br />3 $ 412 <br />1 <br />COR # 32 11 $ 4,607.00 Provide access hatch and revisions to plumbing and sprinkler system $ , <br />398 <br />14 $ , <br />361) <br />(6 <br />COR # 46 11 $ (20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area <br />' $ ) <br />, <br />( <br />5 <br />048 $ , <br />230 <br />2 <br />COR # 49 11 $ 278.00 <br />7 s 199 and 204 <br />Provide insulation at rebar dowels and durometer bearing pad per RFI $ , , <br />COR #52 11 $ , <br />934.00 <br />2 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 $ 2,035 $ 899 <br />COR #58 11 $ , <br />1,407.00 Provide changes to gas pressure regulators per PR #21 $ 976 $ <br />$ 431 <br />COR #77 11 $ - Changes to elevator beams per PR #34 <br />it <br />i <br />i $ <br />$ - <br />268 $ 119 <br />COR #89 11 $ 387.00 te v <br />s <br />Provide additional rebar at south slab step (gridline D) per structural engineer s <br />COR #93 11 $ 855.00 Provide reinforcing at arcade slab per RFI 297 $ 593 <br />938 <br />1 $ <br />$ 262 <br />856 <br />COR #94 11 $ 2,794.00 Provide additional reinforcing and 6" hooks per submittal 2F1 and RFI 328 $ , <br />55 $ 703 <br />1 <br />COR #95 11 $ 5,558.00 Provide changes to nine columns per RFI 317 $ <br />$ 3,8 <br />281 $ , <br />124 <br />COR #96 11 $ 405.00 Provide additional reinforcing for arcade beams per RFI 319 84 $ 655 <br />COR #99 11 $ 2,139.00 Provide slab continuation at bottom of east and west shafts per RFI 236 $ 1,4 <br />366 <br />23 $ 10 <br />322 <br />COR #102 12 $ 33,688.00 Removal and disposal of unsuitable subgrade material $ <br />$ , <br />21 <br />567 $ , <br />- <br />COR #88 13 $ 21,567.00 Removal and disposal of contaminated soils-359.45 c.y. $ , <br />945 $ 417 <br />COR # 14 14 $ 1,362.00 Provide ductwork and supply fan revisions per PR #1 <br />