COR # 41 15 $ 622.00 Provide rebar to header above fire doors at parking separation wall per RFI 12 and COR #41 rev. $ 431 $ 191 <br />COR # 42 5 $ (8,962.00) VE proposal #3-Revise precast panels to mitered corners instead of "U" shape $ (6,216) $ (2,746) <br />COR # 43 <br />$ <br />' <br />$ <br />" <br />COR # 44 5 $ - Provide flourescent lamp revisions <br />COR # 45 5 $ - Provide hollow metal frame revisions $ ' $ " <br />COR # 46 11 $ (20,759.00) Delete bentonite waterproofing and reduce slab thickness in same area $ (14,398) $ (6,361) <br />COR # 47 5 $ 963.00 Provide floor hardener at rooms 1209, 1219, and 1239 $ 668 $ 295 <br />COR # 48 5 $ 105.00 Change wall mounted water closet to floor mounted water closet in room 1224 $ 73 $ 32 <br />COR # 49 11 $ 7,278.00 Provide insulation at rebar dowels and durometer bearing pad per RFI's 199 and 204 $ 5,048 $ 2,230 <br />COR #50 5 $ 315.00 Remove and dispose of UST adjacent to Church Street $ 315 $ - <br />COR #51 7 $ 90,846.00 "' Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils $ 67,965 $ 22,881 <br />COR #52 11 $ 2,934.00 Provide dewatering for undocumented fill areas from 5/21/99 to 6/20/99 $ 2,035 $ 899 <br />COR #53 5 $ 3,186.00 Revise foundation drain pipe specification $ 2,210 $ 976 <br />COR #54 5 $ 1,210.00 Provide added rebar for pilaster at the SW air shaft $ 839 $ 371 <br />COR #55 8 $ 23,550.00 Upgrade windows to Sungate 1000 at three building faces $ 16,334 $ 7,216 <br />COR #56 5 $ (83.00) Provide changes to glazing $ (58) $ (25) <br />COR #57 8 $ 1,569.00 Change column in hearing room $ 1,088 $ 481 <br />COR #58 11 $ 1,407.00 Provide changes to gas pressure regulators per PR #21 $ 976 $ 431 <br />COR #59 8 $ 821.00 Added column ties $ 569 $ 252 <br />COR #60 <br />COR #61 <br />8 <br />$ <br />2,107.00 Added rebar on GF1 per shop drawings <br />$ <br />1,461 <br />$ <br />646 <br />COR #62 8 $ 758.00 Luminar base at flagpole $ 526 $ 232 <br />COR #63 8 $ 2,310.00 Stand pipe changes per PR #3 $ 1,602 $ 708 <br />COR #64 8 $ 40,678.00 Added rebar at pour strips $ 28,214 $ 12,464 <br />COR #65 8 $ (3,600.00) Delete 2' sand layer $ (2,497) $ (1,103) <br />COR #66 8 $ 208.00 Added steel bracing at canopy $ 144 $ 64 <br />COR #&7 8 $ 9,245.00 Change door frames per PR #31 $ 6,412 $ 2,833 <br />COR #68 8 $ 553.00 Owner's job shack phone $ 384 $ 169 <br />COR #69 8 $ 116.00 Provide dowels at east stairwell $ 80 $ 36 <br />COR #70 8 $ 371.00 Provide thickened generator slab $ 257 $ 114 <br />COR #71 8 $ 2,201.00 Provide changes to air intake $ 1,527 $ 674 <br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks $ (3,318) $ - <br />COR #73 8 $ 5,269.00 Provide changes to column base $ 3,655 $ 1,614 <br />COR #74 <br />COR #75 <br />9 <br />$ <br />(17.00) Provide revisions to electrical drawings per PR #16 <br />$ <br />(12) <br />$ <br />(5) <br />COR #76 9 $ 11,157.00 Provide changes to air at rooms per PR #27 $ 7,738 $ 3,419 <br />COR #77 11 $ - Changes to elevator beams per PR #34 $ ' $ " <br />COR #78 9 $ 964.00 Added dowels and shear head $ 669 $ 295 <br />COR #79 10 $ 82,520.00 Removal and disposal of unsuitable subgrade material $ 57,236 $ 25,284 <br />COR #80 <br />COR #81 <br />14 <br />$ <br />4,607.00 Provide concrete ceiling above switch gear and revise CMU walls per RFI 193 <br />$ <br />3,195 <br />$ <br />1,412 <br />COR #82 9 $ 726.00 Provide two additional 4" conduit sleeves in Data/Com room per PR # 29 $ 504 $ 222 <br />COR #83 9 $ 677.00 Provide two additional 1" conduits with pull cords per PR # 28 $ 470 $ 207 <br />COR #84 9 $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal alternate # 32 $ 6,215 $ 2,745 <br />315 <br />16170 <br />